My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
3500 - Local Oversight Program
>
PR0545700
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:09:22 AM
Creation date
5/28/2020 10:08:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545700
PE
3529
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
02
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br /> Michael Infurna , Jr. <br /> August 21, 2002 <br /> Page 5 of 5 <br /> REPORT PREPARATION <br /> Information collected during the investigation will be summarized in a report. The report will <br /> include an evaluation of the sampling and analysis results, figures showing the distribution of <br /> chemicals in soil and groundwater and locations of pertinent features, boring logs, tabulated data, <br /> and analytical laboratory reports and sample chain-of-custody documentation. <br /> SCHEDULE <br /> Field work will be performed contemporaneously <br /> with other investigationsations being performed at <br /> the Stockton CANG facility. To facilitate the preparation and review of work plans, acquisition <br /> of vendors, and mobilization, field work is tentatively scheduled to begin the week of September <br /> 23, 2002. Field activities will be completed in one day. A report will be submitted to the PHS- <br /> EHD within six weeks of the completion of field work, following internal review by the CGE <br /> and LANG. <br /> Versar appreciates your review and consideration of this work plan, and looks forward to <br /> receiving approval to proceed. If you have any questions or concerns regarding this submittal, <br /> please contact Mr. Tim Berger at (916) 863-9323 and at beraer@versar.com. <br /> Respectfully submitted, <br /> Tim Berger, R.G., H.G. Rg No. 5225 <br /> Program Manager Exp,4{-,8{x&' <br /> Versar—Southwest Region JOl3��Q3 <br /> Attachments: Figures £OF CAO <br /> Cc: Mr. Gary Krongard, Army Corps of Engineers, Sacramento Division <br /> Capt. Kenneth Koop, California Army National Guard <br /> k <br /> 302 3-031104700.4766.2301AUG2 V02 02 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.