Laserfiche WebLink
GR Field Methods and Procedures <br /> Stockpile Sampling <br /> Stockpile samples consist of four individual sample liners collected from each 100 cubic yards (yd3) of <br /> stockpiled soil material. Four arbitrary points on the stockpiled material are chosen,and discrete soil sample <br /> is collected at each of these points. Each discrete stockpile.sample is collected by removing the upper 3 to 6 <br /> inches of soil, and then driving the stainless steel or brass tube into the stockpiled material with a wooden <br /> mallet or hand driven soil sampling device. The sample tubes are then covered on both ends with teflon <br /> sheeting or aluminum foil, capped, labeled,placed in the cooler with blue ice for preservation. A chain-of- <br /> custody form is initiated in the field and accompanies the selected soil samples to the analytical laboratory. <br /> Stockpiled soils are covered with plastic sheeting after completion of sampling. <br /> Construction of Monitoring-Wells <br /> , <br /> Monitoring wells are constructed in the exploratory borings with Schedule 40 polyvinyl Chloride (PVC) ! <br /> casing. All joints are thread joined; no glues, cements, or solvents are used in well construction. The <br /> screened interval is constructed of machine-slotted PVC well screen which generally extends from the total <br /> well depth to a point above the groundwater. An appropriately-sized sorted sand is placed in the annular <br /> space adjacent to the entire screened interval. A bentonite transition seal is placed in the annular space <br /> above the sand, and the remaining annular space is sealed with neat cement or cement grout. <br /> Wellheads are protected with water-resistant traffic rated vault boxes placed flush with the ground surface. <br /> The top of the well casing is sealed with a locking cap.. A lock is placed on the well cap to prevent <br /> vandalism and unintentional introduction of materials into the well. <br /> Storing and Sampling of Drill Cuttings <br /> Drill cuttings are stockpiled on plastic sheeting or stored in drums depending on site conditions and <br /> regulatory requirements. Stockpile samples are collected and analyzed on the basis of one composite <br /> sample per 50 cubic yards of soil. Stockpile samples are composed of four discrete soil samples, each <br /> collected from an arbitrary location on the stockpile. The four discrete samples are then composited in the <br /> laboratory prior to analysis. j <br /> 3 <br /> Each discrete stockpile sample is collected by removing the'upper 3 to 6 inches of soil, and then driving the <br /> stainless or brass sample tube into the stockpiled material with a hand, mallet, or drive sampler. The sample ! <br /> tubes are then covered on both ends with teflon sheeting or aluminum foil, capped, labeled, and placed in a <br /> cooler with blue ice for preservation. A chain-of-custody form is initiated in the field and accompanies the <br /> selected soil samples to the analytical laboratory. Stockpiled soils are covered with plastic sheeting after <br /> completion of sampling. <br /> Wellhead Survey <br /> The top of the newly-installed well casing is surveyed by a California-licensed Land Surveyor to mean sea <br /> level (MSL). <br /> A-2 <br /> i <br /> i <br />