Laserfiche WebLink
• Monitoring Well Installation Work Plan <br /> SUTTER OFFICE CENTER <br /> 242 North Sutter Street, Stockton, California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND SCOPE OF WORK 1 <br /> 2.0. SCOPE OF WORK 1 <br /> 2 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES 1 <br /> 22 DRILLING AND SOIL SAMPLE COLLECTION 2 <br /> 23 MONITORING WELL INSTALLATION, DEVELOPMENT AND SURVEY 3 <br /> 24 GROUND WATER SAMPLING AND ANALYSIS 3 <br /> 25 PREPARATION OF REPORT OF FINDINGS 3 <br /> 3.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3 1 PILOT SOIL BORING 4 <br /> 32 WELL COMPLETION AND WELL ELEVATION SURVEY 4 <br /> 3 3 WELL DEVELOPMENT 5 <br /> 34 GROUNDWATER SAMPLING PROCEDURES 5 <br /> 3 4 1 Static Water Level Measurements 6 <br /> 3 4 2 Well Evacuation 6 <br /> 3 4 3 Sample Withdrawal 6 <br /> 3 4 4 Sample Handling 6 <br /> 3 5 EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT 7 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Cross Section <br /> Figure 4 - Shallow Monitoring Well Design <br /> Figure 5 -Deep Monitoring Well Design <br /> APPENDIX <br /> Appendix A - Historical Background-Site Model with Cross Section <br />• Advanced GeoEnvironmental,[nc <br />