Laserfiche WebLink
i • <br /> • 25 October 2002 <br /> AGE-NC Project No 02-0964 <br /> Page 4 of 8 <br /> 3.0. SCOPE OF WORK <br /> To assess the vertical and lateral extent of hydrocarbon solvent-impacted soil and gi ound water at <br /> the site, completion of the following tasks is required <br /> • Permitting and pre-field work activities, <br /> • Cone penetrometer test (CPT) drilling and sample collection and <br /> • PI epai ation of a report of findings <br /> 3 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> A site assessment boring permit will be obtained h om the EHD for all on-site and off-site well <br /> locations In addition encroachment or access permits or permission will be obtained from the City <br /> of Stockton (COS) to allow for assessment off-site PI ioi to mobilization, the soil boring locations <br /> will be clearly mai ked and a utility clearance obtained through Undergiound Service Alert <br /> 3 2 CONE PENETROMETER TEST DRILLING AND SAMPLE COLLECTION <br /> AGE proposes to drill up to six paired CPT soil borings to characterize lithology, assess the vertical <br /> and lateral extent of impacted soil and ground water, and model potential contaminant n-agration <br /> pathways at the site Based on the distribution of contaminates encountered to date, AGE proposes <br /> to advance four CPT soil borings in the following locations (Figure 2) <br /> • CPT 1 at the location of monitoring well MW-I and soil borings A and I, <br /> • CPT2 at the location of soil bonings B and 7, <br /> • CPT3 between the location of monitoring wells MW-2 and MW-3, southwest of CPT2, and <br /> • CPT4 on Miner Avenue north of the at the location of soil boring H <br /> Two additional locations to help define the lateral extent of the dissolved hydrocarbons plume are <br /> • CPT5 approximately 25 feet northwest of soil boring D and <br /> • CPT6 immediately south of soil boring G <br /> The fiist boring at each location will be a cone penetrometer (CPT) bore, the CPT will acquire a <br /> continuous lithologic recoi d to define the hydrologic units A second bonng subsequently will be <br /> advanced Immediately adjacent to the first boie to acquire soil and grab ground water samples in <br /> targeted zones based on Interpreted lithologic data and assessment needs The CPT borings will be <br /> Advanced GeoEnv►ronmentar,Inc <br />