Laserfiche WebLink
. 25 October 2002 <br /> AGE-NC PI oject No 02-0964 <br /> Page 5 of S <br /> advanced to appy oximately 160 feet bsg,depending on analytical results or Immediate field indications <br /> of grab water samples,the total depths of borings may vary according to subsurface conditions (e g , <br /> refusal) encountered during drilling activities <br /> Grab ground water samples will be collected in multiple Intervals of porous and permeable material, <br /> and lirruted soil samples will be collected at selected lithology changes to define the vertical extent <br /> of adsorbed hydi ocarbons below the farmer suspected UST-system locations Ground water and <br /> selected soil samples will be analyzed by a Department of Health Services(DHS)-certified laboratory <br /> foi petroleum hydi ocarbons, volatile organic compounds and halogenated organic compounds and <br /> fuel additives listed in Section 4 2 Laboratory reports for soil and ground water analysis, testing <br /> methods, laboratory QA/QC i eports, and sample chain of custody documentation will be presented <br /> In a report of findings and recommendations <br /> 33 REPORT PREPARATION <br /> Following the CPT site Investigation a report will be prepared presenting the findings Each report <br /> will Include a description of woi k performed and the results of the soil/ground water sampling and <br /> analysis Conclusions and recommendations will also be included in the reports preparing the site foi <br /> addition site assessment, Including monitor Ing well Installation and other corrective actions The <br /> report will be in a format acceptable to RWQCB guidelines, and will be reviewed and signed by a <br /> California Registered Geologist <br /> 4 0. FIELD PROCEDURES <br /> All field pi ocedul es will be ovei seen by an AGE i epresentative under the supervision of a California <br /> Registered Geologist Procedures for soil and ground watei sampling ale described below <br /> 41 CONE PENETROMETER TEST SOIL BORINGS <br /> Each CPT soil boring will be advanced to a total depth of 160 feet bsg utilizing a 25-tan truck- <br /> mounted CPT di ill ng equipped with 2-Inch diameter hollow-stem i ods The first soil bol Ing will <br /> utilize a hydi aullc ram to advance a cone penetrometer to the desired depth Soil parameters such as <br /> cone bearing, sleeve friction, friction ration and pore water pressure will be measured as the cone <br /> peneti ometer is advanced Rinseate generated as part of the drilling activities will be containerized <br /> In pr opel ly labeled DOT-approved 55-gallon drums and stored on-site in an area lacking public <br /> access Disposal alternatives will be evaluated at a latei date based on laboratory results of rinseate <br /> samples <br /> Advanced GeoEnvironmental,Inc <br />