My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SWIFT
>
781
>
3500 - Local Oversight Program
>
PR0545705
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:22:06 PM
Creation date
5/28/2020 12:13:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545705
PE
3528
FACILITY_ID
FA0005062
FACILITY_NAME
GOLDEN EAGLE EXPRESS TRUCKING
STREET_NUMBER
781
STREET_NAME
SWIFT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16326003
CURRENT_STATUS
02
SITE_LOCATION
781 SWIFT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"INK <br /> SITE CHARACTERIZA�]N WORKPLAN '... <br /> SWIFT TRANSPORTATION <br /> WALLACE•KLlHI,&ASSOCIATES.INC. <br /> January 29, 1991 <br /> WKA No. 1004.37 <br /> Page 2 <br /> existing excavated soil and covered with plastic sheeting. All work will be performed under the <br /> direct supervision of a registered geologist. <br /> Report of lindin s <br /> Upon completion of our field work and the laboratory testing, we will prepare a formal report <br /> which will include: <br /> • a site plan showing locations of borings <br /> • logs of borings <br /> • laboratory test results with chain-of-custody <br /> • conclusions regarding the extent of soil contamination <br /> • recommendations for remediation of contaminated soil and/or further investigation, <br /> if necessary. <br /> Please call us if you have any questions regarding our proposed scope of work. <br /> Wallace - Kuhl and Associates, Inc. <br /> Anthony Saracino Eric Hubbard <br /> Senior Geologist Project Geologist <br /> attachments: site plan <br /> site safety plan �R� GAO <br /> ERIC J. <br /> HUBBARD <br /> � �F No.4807 <br /> AN�yONY •'.� Exp. b �9.s <br /> SARACINO �� •.. .•'�� <br /> � i <br /> No.Iazo •. 9TF OF GAL�F�Q� <br /> CERTiFILD <br /> ENGINEERING <br /> J,•. GEQLOGisT <br /> R1 F•OF CAO� <br />
The URL can be used to link to this page
Your browser does not support the video tag.