My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAPREALIAN ENGINEERING, INC. <br /> K E I Consulting Engineers <br /> 535 Main Street <br /> Martinez, Ca.94553 <br /> (415) 372-5444 <br /> KEI-P86-084A <br /> October 14 , 1986 <br /> PROPOSAL <br /> MOBIL STATION #10-NP4 <br /> TRACY, CALIFORNIA <br /> 1 .0 INTRODUCTION <br /> This proposal outlines additional work needed to satisfy the <br /> State and Local Regulatory Agencies for identifying the <br /> potential spread of fuel hydrocarbons contamination from the <br /> Mobil Service Station #10-NP4 in Tracy , California. In the <br /> KEI report dated September 12 , 1986, it was recommended that <br /> 1) Install additional 3 to 4 wells downgradient from the <br /> site and 2) Sample private wells within a 1/2-mile <br /> downgradient from the site ; in lieu of shallow ground water <br /> clean up. <br /> Proposed wells MW-5 to MW-8 will determine the extent of <br /> fuel contamination off the site . <br /> 2 .0 SCOPE OF WORK <br /> 2 . 1 A Geologist will be assigned to the project who will be <br /> responsible for the field safety plan for employee <br /> protection , monitoring and barricading of the drilling <br /> during the conduct of this work. <br /> 2 . 2 In order to start drilling, it will be necessary to obtain <br /> either verbal authorization or a permit . Permission to <br /> drill on the property adjacent to the station will also be <br /> required . <br /> 2.3 Installation and construction of four (4) additional <br /> monitoring wells as shown on attached sketch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.