Laserfiche WebLink
KEI-P86-084A <br /> October 14 , 1986 <br /> Page 2 <br /> 2 .4 During the well construction , soil samples will be collected <br /> at five foot intervals and will continue until the first <br /> water table is encountered . <br /> 2 . 5 The monitoring wells will be observed for free product, <br /> sheen and odor . Water samples will be taken and analyzed <br /> for total hydrocarbons , Benzene , Toluene and Xylene . <br /> 2 .6 Elevation of the wells to be installed will be surveyed . <br /> 2 , 7 Results of the samples will be evaluated as to the current <br /> and potential impact on the ground water. <br /> 2 .8 A technical report will be submitted within thirty (30) days <br /> of completion of the soil and water sampling. The report <br /> will document the field work performed , chemical analyses of <br /> soil/water , conclusions and recommendations. <br /> 3.0 SCHEDULING <br /> KEI is prepared to start the work as soon as" this proposal <br /> is accepted by the Mobil Oil Company. <br />