My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEI-P86-084A <br /> October 14 , 1986 <br /> Page 2 <br /> 2 .4 During the well construction , soil samples will be collected <br /> at five foot intervals and will continue until the first <br /> water table is encountered . <br /> 2 . 5 The monitoring wells will be observed for free product, <br /> sheen and odor . Water samples will be taken and analyzed <br /> for total hydrocarbons , Benzene , Toluene and Xylene . <br /> 2 .6 Elevation of the wells to be installed will be surveyed . <br /> 2 , 7 Results of the samples will be evaluated as to the current <br /> and potential impact on the ground water. <br /> 2 .8 A technical report will be submitted within thirty (30) days <br /> of completion of the soil and water sampling. The report <br /> will document the field work performed , chemical analyses of <br /> soil/water , conclusions and recommendations. <br /> 3.0 SCHEDULING <br /> KEI is prepared to start the work as soon as" this proposal <br /> is accepted by the Mobil Oil Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.