My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012636 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0012636 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:50:26 PM
Creation date
5/28/2020 12:37:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012636 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pr <br /> r a <br /> f <br /> The proposed ground water remodiatinn syr�tem will consist of <br /> the following items: <br /> 1. Recovery well (monitoring well Mld-5) . Per monitoring <br /> well construction records (Kaprealian, 1987) , Wd was <br /> completed to a depth of 20 loot below ofa4etaih feet <br /> 0.020-inch ©lotted screen from dee <br /> thsbelow grade. Since the wat. ctededrawdown l is rofi2.5efeet <br /> 5 fact <br /> ewollgrade, <br /> allow the pump to be positioned <br /> at 1 9P above the bottom of the well to prevent <br /> sufficiently pumping rate of <br /> intrusion of solids into the pump- <br /> intrusion <br /> p P g <br /> approximately 1 gpm or less will be maintadrncarbon order <br /> to prevent capture <br /> ionosite•Of the by <br /> plume from the adjacent <br /> and lateral piping connecting <br /> 2. An air-displacement pumpthe <br /> the well to the treatment system andwill befdesigned to <br /> the storm drain connection• piping will <br /> An air <br /> allow for potential system exp will, be <br /> compressor and associated air supply piping <br /> necessary. <br /> 3. An above ground treatment system, <br /> to include: <br /> a. Microprocessor for system timing and sequencing. <br /> b. 'rwo carbon canisters. Based on an assume average <br /> influent TPH-G concentration of tion capacity of <br /> of 1 gpm, and a carbon adsorp <br /> 6 pounds of hydrocarbons per 100 pounds of carbon, <br /> approximately 20pounds of carbon will be expended <br /> per month initially. Higher TPH-G concentrations <br /> are likely if significant quantities of free <br /> Product are drawn into the recovery well or if an <br /> ver <br /> increase in flow rate is neCXoast. atelyh1,200rpounds <br /> carbon canisters will be aFP of carbon <br /> each to minimize the frequency <br /> replacement. <br /> C. one oil/water separator t:auk and one 250-gallon <br /> double-walled, above ground product <br /> tank. tp are <br /> ground tanks of up tp ve <br /> a 1,100 gallonthe <br /> permitted in Trecy per Section 3- 1.104 of all nror <br /> ISMof Tracy Fire Cede, t requiredstofa 250 be permgallon <br /> tted per <br />. _---- _ -- ----_- less_ capacity r..e not req - <br /> - - - - regulations. <br /> Rule 202.B.5.i-of the-S,7CAPCA <br /> d. An air-displacement pump for ground water recovery <br /> and a 1 hoerviceestationecompressorssor for iwillpbeyusedhif <br /> existing se <br /> T feasible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.