Laserfiche WebLink
-s ,: a .�:- -, "._.�-.'� -.._ �, :.-� ' . '+'• S - �'u -� £� �.�� _.:;i'£. es3fy <br /> .o` Y _r-} .t �-r � Y3 � =� � a• .. � s��r'i .� � r�- �, :��,:.,,,�` i.., x -�,.T �-� �:Yy,. - <br /> 15' E a„, .; .sem'- �• � �y��;, ".g,� �� m '� .'�. � ' ��- .w'�' � �'h' '�wa r «; <br /> s _ . <br /> .. �.'.. �� ..,. _ C ,La* � •. i ..-.. .• .� -•ys7� Jk� W��-. _ =�,.Sr"�.� _�t� _ - �..Ca�:"�..k"7"'9'. -�+Z�:`Y' ..�36. �i ,g,r � s:... ..._acs: <br /> ...- _- �:r.�.- ... u° :- _. , -,�. . � ._ , a __ v rt.:.T-«�'�- � - __,3s:�` � t- -�? , saz-r,''_ s•.• ,--�°ate;. „s.'�-ir�.s"` :,e .�"' — -.�° <br /> - r,,, �"._ __s Fs^aux. .. „�N. �..aai Y•-r ,z + !r'" �,?. � :7 <br />' ;•_ . � - Tr -_.. �� � ��r,' _�T�� � `�� i' 4,i:�y� � __ 4f ��iy ,r- �' ��� "1st.3' �:4±'r;��.��,c+rCG:: :?.g.. E` ;.-�.:_ <br /> I <br /> 5' <br /> ..j <br /> rr <br /> i <br /> C. A pump for transfor of water from the oil/water <br /> separator through the carton units and to storm <br /> the <br /> drain. <br /> Fain. nic probes for automatic level control with <br /> f. <br /> redundant: probes for emergency shutdown. <br /> Trenching and paving fro;n tale recovery well to the <br /> g� treatment system equipment and to the storm drain. <br /> water piping and air nupplY line within secondary <br /> containment. <br /> h. A reinforced concrete pt-ad with a 6-inch curb for <br /> for security <br /> spill containment andf 6-fOOb <br /> and visual screening o <br /> the ovenground equipment. <br /> i, wiring and return water piping connecting the <br /> recovery pump to the treatment system- <br /> The above ground equipment compound will be located to <br /> minimize bnta�rnconspicuousmal service as possible.taToominimizelons <br /> and will all system components will. be installed <br /> installation costs, Y <br /> in a centralized locatioservice station <br /> n, at tale rear of the <br /> shows the proposed layout of the <br /> building. Figure 7 <br /> recovery/treatment system. <br /> Prior to construction of the system, approvals and permits <br /> will be obtained from the appropriate agencies, which <br /> include, but may not be limited to, the SJCEBS, the annig- °f <br /> Tracy Fire Department Building Division CentralRValleygRogion. <br /> Division, <br /> the SJCAPCD, and the RWQCB, <br /> r. Bob Sagaser, Environmental Controls <br /> Per a discussion with roof Trac( Utilities Department, <br /> Inspector for the City Y round water to the sanitary <br /> continuous discharge of treated g <br /> t being permitted due to the additional <br /> sewer is currently no <br /> loading on the system. Therefore, a National pollution <br /> Elm nation System (NPDES) permit application to <br /> Discharge the storm sewer has been filed <br /> discharge treated water to <br /> with the RWQCB. <br /> operational, Alton <br /> Once the recovery/treatment system is <br /> Geoscience will perform testing of the effluent as required <br /> water samples will be <br /> by the NPDES permit' At a minimum, operation and <br /> --- analyzed for_TPH-G_with BTEX disaidtand�followion An d_to ensure <br /> will be prep - - <br /> maintenance program ment. <br /> continued safe oanrateioraand mble aintenance <br /> Appendix <br /> shown in <br /> A preliminary p <br /> Appendix A. <br /> 9 <br /> I <br /> I <br /> M. _- __ <br />