|
-s ,: a .�:- -, "._.�-.'� -.._ �, :.-� ' . '+'• S - �'u -� £� �.�� _.:;i'£. es3fy
<br /> .o` Y _r-} .t �-r � Y3 � =� � a• .. � s��r'i .� � r�- �, :��,:.,,,�` i.., x -�,.T �-� �:Yy,. -
<br /> 15' E a„, .; .sem'- �• � �y��;, ".g,� �� m '� .'�. � ' ��- .w'�' � �'h' '�wa r «;
<br /> s _ .
<br /> .. �.'.. �� ..,. _ C ,La* � •. i ..-.. .• .� -•ys7� Jk� W��-. _ =�,.Sr"�.� _�t� _ - �..Ca�:"�..k"7"'9'. -�+Z�:`Y' ..�36. �i ,g,r � s:... ..._acs:
<br /> ...- _- �:r.�.- ... u° :- _. , -,�. . � ._ , a __ v rt.:.T-«�'�- � - __,3s:�` � t- -�? , saz-r,''_ s•.• ,--�°ate;. „s.'�-ir�.s"` :,e .�"' — -.�°
<br /> - r,,, �"._ __s Fs^aux. .. „�N. �..aai Y•-r ,z + !r'" �,?. � :7
<br />' ;•_ . � - Tr -_.. �� � ��r,' _�T�� � `�� i' 4,i:�y� � __ 4f ��iy ,r- �' ��� "1st.3' �:4±'r;��.��,c+rCG:: :?.g.. E` ;.-�.:_
<br /> I
<br /> 5'
<br /> ..j
<br /> rr
<br /> i
<br /> C. A pump for transfor of water from the oil/water
<br /> separator through the carton units and to storm
<br /> the
<br /> drain.
<br /> Fain. nic probes for automatic level control with
<br /> f.
<br /> redundant: probes for emergency shutdown.
<br /> Trenching and paving fro;n tale recovery well to the
<br /> g� treatment system equipment and to the storm drain.
<br /> water piping and air nupplY line within secondary
<br /> containment.
<br /> h. A reinforced concrete pt-ad with a 6-inch curb for
<br /> for security
<br /> spill containment andf 6-fOOb
<br /> and visual screening o
<br /> the ovenground equipment.
<br /> i, wiring and return water piping connecting the
<br /> recovery pump to the treatment system-
<br /> The above ground equipment compound will be located to
<br /> minimize bnta�rnconspicuousmal service as possible.taToominimizelons
<br /> and will all system components will. be installed
<br /> installation costs, Y
<br /> in a centralized locatioservice station
<br /> n, at tale rear of the
<br /> shows the proposed layout of the
<br /> building. Figure 7
<br /> recovery/treatment system.
<br /> Prior to construction of the system, approvals and permits
<br /> will be obtained from the appropriate agencies, which
<br /> include, but may not be limited to, the SJCEBS, the annig- °f
<br /> Tracy Fire Department Building Division CentralRValleygRogion.
<br /> Division,
<br /> the SJCAPCD, and the RWQCB,
<br /> r. Bob Sagaser, Environmental Controls
<br /> Per a discussion with roof Trac( Utilities Department,
<br /> Inspector for the City Y round water to the sanitary
<br /> continuous discharge of treated g
<br /> t being permitted due to the additional
<br /> sewer is currently no
<br /> loading on the system. Therefore, a National pollution
<br /> Elm nation System (NPDES) permit application to
<br /> Discharge the storm sewer has been filed
<br /> discharge treated water to
<br /> with the RWQCB.
<br /> operational, Alton
<br /> Once the recovery/treatment system is
<br /> Geoscience will perform testing of the effluent as required
<br /> water samples will be
<br /> by the NPDES permit' At a minimum, operation and
<br /> --- analyzed for_TPH-G_with BTEX disaidtand�followion An d_to ensure
<br /> will be prep - -
<br /> maintenance program ment.
<br /> continued safe oanrateioraand mble aintenance
<br /> Appendix
<br /> shown in
<br /> A preliminary p
<br /> Appendix A.
<br /> 9
<br /> I
<br /> I
<br /> M. _- __
<br />
|