My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012636 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0012636 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:50:26 PM
Creation date
5/28/2020 12:37:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012636 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 .0 SITE SAFETY PLAN <br /> All field Procedures and activities related to the conduct of <br /> the site work will be In accordancewith a Site-specific <br /> safety n1an developed for the site. <br /> The site safety plan <br /> will be developed in compliance with applicable requirements <br /> of the California Department Of Health Services and the <br /> Federal and State occupational Safety and Health <br /> Administration {OSHA and Cal-OSHA) . <br /> 8.0 IMPLEMENTATION SCHEDULE <br /> The site activities proposed herein will be completed within <br /> approximately 120 work days after work plan approval and <br /> acquisition of the NPDES permit. The schedule for completion <br /> of major tasks is as follows: <br /> uliyity Aftz nnrnvnl <br /> - Pre-C-nstruction. Activities 20 <br /> - Equipment installation 65 <br /> 120 <br /> - Startup <br /> Due to the nature and logistics involved with the <br /> extraction/treatment system permitting and installation, this <br /> schedule may be subject to revision. Acquisition of the <br /> NPDES permit may take up to 6 months. Any changes to the <br /> schedule will be communicated in advance to the appropriate <br /> agencies and parties involved. <br /> I V i 11M <br />
The URL can be used to link to this page
Your browser does not support the video tag.