Laserfiche WebLink
IMODN <br /> �� dY'I.'{� �t `� �- y-(�3..a;�E�. rte, � ice' �S4 A "�.� E 1{t�•fi -5J- '�+ .P:t � <br /> � rye L <br /> the Proposed work plan for ground wz%ter <br /> outline of resented below: <br /> remediation is p <br /> Task l• Uro11 � rocurement <br /> royals, detailed <br /> Fre-construction aermitsrand es wapp ill include e P stem, <br /> e all necessary P plan, liaison <br /> engineering design of. the re cc safety pla , s <br /> development of a site <br /> specific safety p <br /> with appropriate agencies tofrConstructionrl <br /> the and field <br /> (if necessary}, scheduling and location of <br /> activities and subco tractOar s t an <br /> underground utility g <br /> d piping. <br /> n <br /> Task 2: � - round Water <br /> Equipment and hardwsystemfor <br /> will include: <br /> recovery/treµtment <br /> system <br /> trenching, pipingr installation of the electrical <br /> supply, tank sensorE <br /> tankafor initialnd wiring, pdischarge of <br /> (including a temporary an air <br /> if required) , carbon ca <br /> nisters► a <br /> effluent, (if required) , piping between tanks, <br /> compressor <br /> concrete pad, <br /> and security fencing• <br /> Task 3: <br /> Of recovery system equipment would include <br /> Startup and ad3ustments of operating <br /> troubleshooting <br /> parameters• <br /> r stem would <br /> operation and maintenance of <br /> the and <br /> include weekly (or as required) <br /> monthly collection and <br /> analysis of effluent samples, preparation of <br /> analysis of influent same monthly fluid-level <br /> quarterly progress reports, Wells, <br /> monitoring of all recovery <br /> lingnd moflall ywells for at <br /> quarterly ground Water same <br /> ters, and periodic maintenance of the <br /> least 4 quayuarequipment will be operationally <br /> system. a computer on abasi.s <br /> monitored over telephone lines by P weekly <br /> daily basis and visually thePeafter°n Effluent may <br /> for a month, and monthly it <br /> be dtank initially pending <br /> discharged to a temporary Permit <br /> verification that NPDEs discharge <br /> requirements are satisfied. <br /> 10 <br />