My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
4614
>
2900 - Site Mitigation Program
>
PR0515510
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:59:03 PM
Creation date
5/28/2020 3:57:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515510
PE
2965
FACILITY_ID
FA0012200
FACILITY_NAME
TURNER ROAD VINTNERS EAST
STREET_NUMBER
4614
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02512026
CURRENT_STATUS
01
SITE_LOCATION
4614 W TURNER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Monitoring Report—First Quarter of 2010 Page 4 <br /> ' TURNER ROAD VINTNERS April 30, 2010 <br /> WKA No. 5279.03 <br /> groundwater elevations based on the recent survey results. Groundwater elevations are presented <br /> in feet above mean sea level (msl). <br /> ' 4.2 Groundwater Sampling <br /> ' In addition to DTW monitoring conducted on March 16, 2010, groundwater samples were <br /> collected from each of the five groundwater-monitoring wells. Prior to sampling, each well was <br /> ' purged of at least three casing volumes. During purging, turbidity, temperature, pH, <br /> conductivity, and total dissolved solids (TDS) measurements and/or observations were recorded <br /> for each monitoring well. <br /> 1 <br /> Dedicated low-density polyethylene (LDPE)tubing was used for each well for purging/sampling. <br /> ' Following purging of the calculated well-purge volume, groundwater samples were obtained. <br /> Each well was purged using an electric submersible pump and samples were collected from the <br /> ' purge pump discharge. All groundwater samples were collected in laboratory-preserved, <br /> analyte-specific sampling containers provided by the analytical laboratory. Samples were <br /> immediately placed in a chilled cooler and submitted under chain-of-custody documentation to <br /> ' California Laboratory Services, Inc. of Rancho Cordova, California, a California Department of <br /> Health Services-certified laboratory, for analysis as follows: <br /> ' • Nitrate-as-nitrogen <br /> • Total dissolved solids <br /> ' • Standard Minerals <br /> ' • Specific Conductivity <br /> • pH <br /> ' Well monitoring and purging equipment were cleaned prior to use in each well. Equipment <br /> cleaning rinsate and water purged from the wells were discharged into one of the aeration ponds <br /> ' on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.