My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
5852
>
2900 - Site Mitigation Program
>
PR0515511
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:01:45 PM
Creation date
5/28/2020 4:00:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515511
PE
2965
FACILITY_ID
FA0012201
FACILITY_NAME
TURNER ROAD VINTNERS WEST
STREET_NUMBER
5852
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02512001
CURRENT_STATUS
01
SITE_LOCATION
5852 W TURNER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOA Environmental Project Number E98191 <br /> ' pursuant to Waste Discharge Requirements Order No. 99-103 dated 2 August, 1999. To wit: <br /> Quarterly analyses: each groundwater monitoring well: <br /> ' Nitrate as Nitrogen <br /> TDS <br /> Specific Conductivity <br /> ' pH <br /> ' Semi-annual analyses: each groundwater monitoring well: <br /> Calcium <br /> Magnesium <br /> ' Sodium <br /> Chloride <br /> Nitrate <br /> ' Sulfate <br /> TDS <br /> Total Alkalinity <br /> ' Hardness <br /> Specific Conductivity <br /> pH <br /> ' STATEMENT OF FINDINGS (RESULTS) <br /> ' Lab Analysis: <br /> Results of the laboratory analysis will be included in the well completion report. <br /> Interpretation of Data: <br /> Interpretations of data will be presented in such a manner so as to satisfy the requirements of the <br /> ' WDR's and the CVRWQCB. <br /> CONCLUSIONS <br /> NOA ENVIRONMENTAL will draw conclusions as to the condition of the site, extent of <br /> contamination, or other issues based upon review of the data obtained through the phased <br /> implementation of this work plan. Data to be provided for agency review are to include as-built plans <br /> ' of the monitoring wells as well as geologic logs of all borings. <br /> RECOMMENDATIONS FOR SUBSEQUENT ACTIONS <br /> ' <br /> NOA ENVIRONMENTAL will make recommendations based uponthe review ofthe datadeveloped <br /> through the implementation of this work plan and all work conducted previously in accordance with <br /> ' the applicable local, state and federal regulations. <br /> PROPOSED SCHEDULE OF IMPLEMENTATION <br /> ' A copy of this work plan will be presented to the CVRWQCD on or before3l August, 1999 <br /> Page -13- <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.