Laserfiche WebLink
' NOA Environmental Project Number E98191 <br /> ' anticipated that these wells will be constructed as close as practicable to the western perimeter fence <br /> adjacent to AIPS Pond#4 and the Storage Lake. Refer to the appendix portion of this workplan for <br /> a graphic depicting the proposed well locations. <br /> ' The American Society of Test and Materials(A.S.T.M.) standard designated D5092-90, "Standard <br /> Practice for Design and Installations of Groundwater Monitoring Wells in Aquifers,"is proposed as <br /> the generally applicable specification for well construction pursuant to this work plan. It is <br /> anticipated that the three (3) wells will be constructed using four inch inside diameter (4"I.D.) <br /> ' Schedule 40 P.V.C.pipe. It is further anticipated that the screened portion of the wells will range in <br /> depth from approximately ten feet(10')to thirty-five feet(35')below the ground surface,with total <br /> depth of the wells being approximately forty feet(40')below the ground surface. It is proposed that <br /> ' the well screen be 0.020" and the filter pack be washed and dried No. 3 sand. Refer to the appendix <br /> portion of this work plan for a graphic depicting the proposed well construction details. <br /> ' Disposal of Auger Cuttings from the Groundwater Monitoring Well Boring: <br /> Auger cuttings(bulk soils generated during the drilling operation)produced during the advancement <br /> of the groundwater monitoring wells to their terminal depth will be placed in drums which will be <br /> ' sealed, labeled, and stored on site prior to disposal. It is anticipated that on-site disposal will occur, <br /> but this will be conditioned upon the facility manager providing suitable space for this purpose. <br /> ' EE uipment Decontamination Procedures During the Groundwater Monitoring Well Boring: <br /> Drilling equipment including, but not limited to, samplers, drop hammers, drill rods,plug, augers, <br /> ' etc. will be steam cleaned prior to use in each drilling location. Cleaning will be conducted in such <br /> a manner so as to contain the water, which will be placed in the appropriate drums, labeled, sealed, <br /> and stored on site prior to disposal in the appropriate manner. <br /> ' Sampler and drilling parts not subjected to steam cleaning will be triple rinsed in two tap water <br /> immersions and then distilled water after being decontaminated in a solution of appropriate detergent <br /> and water. These rinse waters and decontamination washes will be contained in the appropriate <br /> drums, documented, sealed, and stored on site prior to the appropriate disposal. <br /> ' Geotechnical Evaluation of Subsurface Soils/Groundwater Monitoring Wells: <br /> Borings will be advanced using truck mounted drilling rigs. NOA Environmental reserves the right <br /> to employ other drilling equipment and technologies based upon need and site specific conditions. <br /> Under the direction of the Field Geologist, soil samples will be acquired from five foot(5') sample <br /> intervals,or at each change in lithology. In each boring location,the soils encountered will be logged, <br /> and these logs will be included in the well completion report. <br /> Soil Sampling Methods and Equipment <br /> Soil samples will be acquired for the sole purpose of accurately describing the site lithologies by <br /> advancing a two inch (2") diameter Modified California or Split Spoon sampler into the soils a <br /> minimum of eighteen inches(18")using a one hundred and forty(140)pound hammer dropped thirty <br /> Page -10- <br /> 1 <br />