My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1601
>
2900 - Site Mitigation Program
>
PR0521845
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:17:12 PM
Creation date
5/28/2020 4:04:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0521845
PE
2950
FACILITY_ID
FA0014838
FACILITY_NAME
LOPEZ PROPERTY
STREET_NUMBER
1601
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16504013
CURRENT_STATUS
01
SITE_LOCATION
1601 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Message <br /> • • Page i of 1 <br /> Vicki McCartney [EH] <br /> From: bill [wlittle@advgeoenv.com] <br /> Sent: Monday, August 14, 2006 4:45 PM <br /> To: Vicki McCartney [EH] <br /> Subject: RE: Work plan submitted for Lopez Property <br /> Dear Vicki McCartney, I did review the Lopez Property work plan addendum July 2006 and new copy will come to <br /> your office. The well survey comparison is typical to re-survey the new wells with the old wells, sometimes , <br /> sometimes, the numbers are a little different and the comparison can only correct any differences, which the <br /> survey team will usually preferred, and their is no difference in costs for the survey cost. Therefore, the well <br /> survey procedures will only supply the best information for ground water elevation data. Thanks for your attention <br /> in the matter. <br /> ps .Anna is no longer working on the project and I can typically answer basic questions. <br /> -----Original Message----- <br /> From: Vicki McCartney [EH] [mailto:vmccartney@sjcehd.com] <br /> Sent: Monday, August 14, 2006 4:04 PM <br /> To: wlittle@advgeoenv.com <br /> Subject: Work plan submitted for Lopez Property <br /> Bill, <br /> received Additional Site Assessment Work Plan Addendum for Lopez Property dated July 21, 2006. This <br /> work plan was not signed by a professional geologist. Will you please resubmit this work plan after it has <br /> been reviewed and signed by you or another professional geologist at AGE? Also, the last paragraph on <br /> the second page of this work plan addendum states that"the top of each existing and newly installed well <br /> casing (well head), and one existing well head at the adjacent 1607 Turnpike Road site, will be <br /> surveyed to determine its elevation relative to mean sea level. The survey of one well at the adjacent <br /> property will be utilized to correct for any discrepancies in relative casing elevations, and will ensure <br /> consistent groundwater flow modeling." I checked and Morrow Surveying surveyed the wells at both the <br /> Lopez Property and the Comfort Air sites within three months of each other. Is it necessary to resurvey the <br /> top of existing well heads at the Lopez Property site and one existing well head at the Comfort Air site to <br /> ensure consistent groundwater flow modeling? <br /> Thanks, Bill. <br /> Vicki McCartney,Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 E.Weber Avenue <br /> Stockton, CA 95202-2708 <br /> Phone: (209)468-3456 <br /> Fax: (209)468-3433 <br /> E-mail: vmccartney@sjcehd.com <br /> 8/15/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.