My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1601
>
2900 - Site Mitigation Program
>
PR0521845
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:11:30 PM
Creation date
5/28/2020 4:06:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521845
PE
2950
FACILITY_ID
FA0014838
FACILITY_NAME
LOPEZ PROPERTY
STREET_NUMBER
1601
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16504013
CURRENT_STATUS
01
SITE_LOCATION
1601 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR-05-04 MON 12130 PMELL NELSON SCHRIMP FAX NO, 2V26-9320 P. 13 <br /> 12/o.i/8cii� 17:11 F:S 20f� tJf w�:t tFJV1'1 <br /> k% KLEINFELDER <br /> a A 3- to 5-foot bentonit', plus is placed above the rwid pack to provide a seal against <br /> surfssc water infiltration and to reduce the potential for eemeut groat to Ifiltate into the <br /> water, <br /> • Tho rexainine a-InuJar space is filled to the surface with cemenLfbentonite gout. <br /> The wells are,secured in an aboveground or underground locking stovepipe, The well heads <br /> may be enclosed in a water tight cement utility box sot flush to rhe Found surface, when <br /> located in a traffic area. <br /> R-12 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the wells, <br /> 11 <br /> Moritotinig wells are generally developed 24 to 48 hours atter installation to allow the gout to <br /> set. Each weft is first sampled with a clew; disposable bailer to visually inspect for a <br /> hydrocarbon layor or sheen. If no product layer or sheen is obaorved on tho water, the well is <br /> developed by surg ng, pumping or bailing. Surging along the screened interval of the well is <br /> performed to draw the sediment reom the formation into the filter pack and the well, and to set <br /> the sand pack. Development contirtues until the discharge runs relatively clear of fines, <br /> Apptoxlmately 5 to 10 well volumes are generally removed from each monitoring well. <br /> Discharge water is storerl in 55-gallon drums and left on site for later discharge or disposal by <br /> The client, dcpcnding on laboratory results. Ilia drams are labeled with the date, well number, <br /> and a contact person and phone number. <br /> 8-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between walls,developing equipment is washed <br /> in a trisodium phosphate or non-phosphata detergent sclution and rinsed hi distilled water or <br /> steam cleaned prior to use in the next nronitnrinr-,well. <br /> B-3.4 Wall Survey <br /> M%i loc-'tions of Sc.l Lorivas and monitorin; wells, and the elevation of the top of thc; PVC, <br /> casings are usually sarveyed and tied into pomra7cnt mart---Ta, if readily available. Survey <br /> accuracy is O.l loot for dee "x" and coordinates and ,01 foot for the "Z" coordinate. The; <br /> 7101 PRCP F.V Je,'TOiP 133 L�cee_to i,2W3 <br /> Peg;v of ix <br /> 046", fUemre:d-r,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.