My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1601
>
2900 - Site Mitigation Program
>
PR0521845
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:11:30 PM
Creation date
5/28/2020 4:06:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521845
PE
2950
FACILITY_ID
FA0014838
FACILITY_NAME
LOPEZ PROPERTY
STREET_NUMBER
1601
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16504013
CURRENT_STATUS
01
SITE_LOCATION
1601 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR-05-04 MON 12:31 PM AMDELL NELSON SCHRIMP FAX N0, 2CO26-9320 <br /> 3s�osizooa <br /> 17:12 Fd3 res 94WIT P. 14 <br /> �lor4 <br /> ' T '� YLEINFtLDFF <br /> depth to static groundwator is rniasttred from a set location at the top of the PVC caning(usually <br /> the north rim). The depth of water is then subtracted from the elevecin of the Top of the well <br /> casing to ptovie4 a groundwater elevation for each monitoring well Ioeatlon. <br /> 04 GRfiil]VDW�TIRbfOVITCIRING <br /> 841 WaterLevcl Measurements <br /> Wat:r level measurements are made in the wells prior to ptugir.; and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measure-rrtents,the monitoring wells would be opened and <br /> allowod to equiibtate fQr a period of approximately%,hour. <br /> ?. Iho water level probe is docantamiratcd in a trisodium phosphate or non-phosphate <br /> detergent wash,followed by a distilled water rinse,prior to usr,in each well. <br /> 3. Water level nteasumments are. made using R conductivity-based water-level meter. <br /> Depth-to-water is gencially measured from a surveyed m ark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyad casing elevations. <br /> B4.2 Groundwater Sampling <br /> Groundwater samples-am,collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) IS deconuttuinated by steam cleaning, or by <br /> scrubbing in a trisoditun-phospltue or non phosphata detargent wash followed by a <br /> distilled water rinse,prior to use in oath well. Bailer cord is replaced prior to use in each <br /> well. <br /> 2. The depth to grrnrndwater is:nra.nred usLB a mzriducti•.i1'y-based water-lavtl=,%t% <br /> 3. The volume of water in gallons standing in the well is calculated b-v snblraoting the depth <br /> to groundwater rnsasuremeat from the depth of the well and multiplvina by r$e <br /> appropriate conversion fwtor(0.16 for 2-inch wells,and 0.65 for 4-iaoa r.ells). <br /> s <br /> 2200 n�:eamer q,200) <br /> a:2 03 x euvdAa m�. Pe4c er LY <br />
The URL can be used to link to this page
Your browser does not support the video tag.