Laserfiche WebLink
EMERGENCY ACTION PLAN <br /> • Perform an assessment and coordinate emergency closing procedures. <br /> Work area monitors must: <br /> • Assure that all employees have evacuated the work area. <br /> • Report any problems to the emergency coordinator at the assembly area. <br /> Assistants to the physically challenged should: <br /> • Assist all physically challenged employees in emergency evacuation. <br /> Extended Power Loss <br /> In the event of extended power loss to the facilities, certain precautionary measures <br /> must be taken depending on the location and environment of the facility. <br /> • Vidal Pelayo will turn off unnecessary electrical equipment and appliances, <br /> because power restoration could cause a surge that damages electronics and effects <br /> sensitive equipment. <br /> • If the facility is likely to experience freezing temperatures during a long-term power <br /> loss, Vidal Pelayo will turn off and drain the following: <br /> — The fire sprinkler system <br /> — Standpipes <br /> — Potable water lines <br /> — Toilets <br /> • Vidal Pelayo will add non-toxic antifreeze to drains to prevent drain traps from <br /> freezing. <br /> • Vidal Pelayo will move equipment containing fluids that may freeze due to long <br /> term exposure to freezing temperatures to heated areas, and either drain the liquid <br /> or provide the equipment with an auxiliary heat source. <br /> Upon the restoration of heat and power: <br /> • Electronic equipment should be brought up to ambient temperatures before <br /> energizing to prevent condensation from forming on circuitry. <br /> • After the heat has been restored to the facility and water has been turned back on, <br /> Vidal Pelayo will check fire and water piping for leaks from freeze damage. <br /> 7 <br />