Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM NO.94-263 5 <br /> CITY OF RIPON WASTEWATER TREATMENT PLANT <br /> RIPON,SAN IOAQUIN COUNTY <br /> 4. A narrative discussion of the analytical results for all groundwater locations monitored including <br /> spatial and temporal tends, with reference to summary data tables, graphs, and appended analyti 1 <br /> reports (as applicable); <br /> 5. A comparison of monitoring data to the groundwater limitations and an explanation of any violat o <br /> of those requirements; <br /> 6. Summary data tables of historical and current water table elevations and analytical results; <br /> 7. A scaled map showing relevant structures and features of the facility, the locations of monitoring <br /> wells and any other sampling stations, and groundwater elevation contours referenced to mean sea <br /> level datum; <br /> 8. Copies of laboratory analytical report(s) for groundwater monitoring. <br /> C. Annual Report D <br /> An Annual Report shall be prepared as the fourth quarter monitoring report. The Annual Report will <br /> include all monitoring data required in the monthly/quarterly schedule. The Annual Report shall be <br /> submitted to the Regional Board by 1 February each year. In addition to the data nonnally presented <br /> Annual Report shall include the following: <br /> 1. The contents of the regular groundwater monitoring report for the last sampling event of the year, <br /> plus annual monitoring scheduled analytes; <br /> 2. If requested by staff, tabular and graphical summaries of all data collected during the year; <br /> 3. An evaluation of the groundwater quality beneath the wastewater treatment facility; <br /> 4. A discussion of compliance and the corrective actions taken, as well as any planned or proposed <br /> actions needed to bring the discharge into full compliance with the waste discharge requirements <br /> 5. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system <br /> reporting program; <br /> 6. Summary of information on the disposal of sludge and/or solid waste; <br /> 7. The results from annual monitoring of the groundwater wells; <br /> 8. The results from any sludge monitoring required by the disposal facility; <br /> 9. A copy of the certification for each certified wastewater treatment plant operator working at the <br /> facility and a statement about whether the Discharger is in compliance with Title 23, CCR,Divisi n <br /> 3, Chapter 26; and <br /> 10. A forecast of influent flows predicted for the next year. <br /> The Discharger shall implement the above monitoring program on the first day of the month following <br /> adoption of this Order. <br /> Ordered by: <br /> THOMAS R. PIlVKOS, Executive Officer <br /> TRO: 1/17/2003 (Date) <br /> V�an_Janquin Non I SStatTObeien113an JoNuinVtipun WWPPq aR NW 1=03.doc <br />