Laserfiche WebLink
Adik <br /> ' 1W kn KLEIN FELDER <br /> ' 6 COST ESTIMATE <br /> ' The estimated cost for the scope of work described above is $25,894. Cost estimates per <br /> ' work task are as follows: <br /> ' Task Professional Equipment Materials Outside Task <br /> Services Services Total <br /> 1: Workplan 1,440 210 1650 <br /> ' 2: Well Installation 4,257 963 4,891 5,950 16,061 <br /> 3: Well Development 1,606 944 2,550 <br /> ' 4: Sampling & Analysis 1,768 984 600 3,352 <br /> 5: Report of Findings 1.991 80 210 2,281 <br /> ' Subtotals 11,062 2,971 4,891 6,970 25,894 <br /> ' ASSUMPTIONS <br /> 1 The cost estimate associated with the scope of work described by this work requisition is <br /> based on several assumptions. If the scope of work changes or if the assumptions are <br /> incorrect, revisions to this estimate may be necessary. The Jonathan Group will be notified <br /> immediately if revisions are necessary. These assumptions include: <br /> ' o San Joaquin County will approve the scope of work outlined above within <br /> ' one week of receiving the work plan. <br /> ' o Depth to ground water is no more than 50 feet. <br /> o Wells can be installed in borings drilled with a hollow stem auger <br /> ' o No soil samples will be screened using a portable organic vapor analyzer and <br /> no soil samples will be collected for chemical analysis. <br /> ' 129-88-1378 9 <br />