Laserfiche WebLink
0 1* inKLEINFELDER <br /> ' o Soil or water produced during well installation, development, or sampling <br /> will be containerized. <br /> ' o A maximum of five water samples will be submitted to the laboratory for <br /> analysis of chloroform by EPA Method 601. The laboratory will analyze <br /> ' these samples on a normal turn-around-time schedule of three weeks. <br /> 1 <br /> 129-88-1378 10 <br />