My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. • Page 2 of 6 <br /> permit is going to take a few more days, let me know so I can call everybody involved. <br /> Thanks, see you Thursday, <br /> Dennis <br /> From: Mike Infurna [EH] [mai Ito:MInfurna@sjcehd.com] <br /> Sent: Monday, April 14, 2008 9:14 AM <br /> To: Dennis Leikam <br /> Subject: RE: MW work plan <br /> THat would be my first guess..Maybe just a Monday am thing. <br /> at any rate, I'm going thru your last submittal, your March 21 letter to me. <br /> I understand the original 8 well install is down to 6 in this phase. Right? <br /> What I'm NOT clear on is: <br /> 1-which well is proposed to be inside the conductor casing (cc). <br /> 2- I'll need to see 'centralizers'on the conductor casing, at least at the bottom. THe grout annulus MUST <br /> be NLT than 2-inches. Placing a steel casing of a potentially long length into a large hole without <br /> centralizers can allow the cc to rest against the wall. THis is not allowed. I've spoken to Frank at V&W <br /> and he understands I will require at least the BOTTOM of the cc to have centralizers. I figure if we start <br /> centralized at the bottom, all we have to do is centralize the cc at the top and if the welds are straight then <br /> the grout annulus can be maintained. <br /> 3-drill dates and schedule of field work. <br /> I was wondering about using an Exploratory boring/e-log/gamma log. Have you thought of this? We know <br /> drilling out there is a turkey shoot at times and mostly hard with HSA. Since we're/you are NOT sure of the <br /> target depth, how do you feel about a MUD ROTARY small diameter exploratory hole that elogs the soils? <br /> sensitive to saline too. A gamma scan would help with the clays..Once you determine your depths of <br /> concern, we can continue to ream out the hole with MUD rotary and set the cc. <br /> From: Dennis Leikam [ma ilto:den nisl@olives.com] <br /> Sent: Monday, April 14, 2008 8:49 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: MW work plan <br /> Hi Mike, <br /> I got a message that you called, I guess we're having problems with our voice mail <br /> system. If you need to chat, you can reach me on my cell phone 321-2079 or shoot me an <br /> email. I'll try to give you another call in a bit if I don't hear from you. <br /> Thanks, <br /> Dennis <br /> ------------- <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Thursday, April 10, 2008 9:36 AM <br /> To: Dennis Leikam <br /> Subject: RE: MW work plan <br /> I printed these out and will look at them as I get a chance.. <br /> thanks <br /> 4/14/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.