My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 1 of 6 <br /> Mike Infurna [EH] <br /> From: Dennis Leikam [dennisl@olives.com] <br /> Sent: Monday, April 14, 2008 11:55 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: MW work plan <br /> OK, thanks Mike. The first two borings (MW5 and SB4)will NOT have conductor casings. It will <br /> probably be Wednesday or Thursday, but we'll give you a call with plenty of travel time. <br /> Thanks, <br /> Dennis <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, April 14, 2008 11:48 AM <br /> To: Dennis Leikam <br /> Subject: RE: MW work plan <br /> I got enough done on the permit to allow MW5 to go tomorrow. <br /> I'm not sure of it's construction or how many of MW5s there are, but just as long as it's NOT a conductor cased <br /> well, how bad can it be? <br /> OK FOR TOMORROW... <br /> as soon as you decide if MW5 is shallow or deep tomorrow CALL ME. I want to be out there for the grout. Allow <br /> 45-60 minutes travel time for me from your call. <br /> From: Dennis Leikam [mai Ito:den nisl@olives.com] <br /> Sent: Monday, April 14, 2008 9:49 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: MW work plan <br /> Hi Mike - <br /> 1- The only wells proposed for cc's are the PDW's (PDW2, PDW3, PDW4). the proposed deep <br /> BORING (PDB1 will not have a cc, it will just be bored to about 200 feet for stratigraphic data, <br /> then the boring abandoned. <br /> 2- No problem on the cc's, I know Frank will take care of it. <br /> 3- Schedule is approximately: <br /> Well 5-Ap.15 -Ap17, <br /> SB4 -Ap 18 -23 <br /> PDW's - It's hard to say the schedule, but I'm thinking 4 days each, depending on how smooth it <br /> goes. Tentatively scheduled to be done with onsite drilling mid-late May. <br /> About the exploratory mud borings, that's a great idea. I was talking to Frank about it and the <br /> only problem with it is that we HAVE to have soil samples every 5 feet and that's really difficult on <br /> a mud rig. Let's talk about it when you're out in the field setting Well 5 (probably Thursday), <br /> maybe we can come up with something. <br /> I assume we are OK to go tomorrow? Everybody is scheduled to start in the morning, so if the <br /> 4/14/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.