Laserfiche WebLink
MUsco Family Olive Company 8 November 2016 <br /> Pond A Clean Closure Site Inspections <br /> w <br /> J�. <br /> Photo 1: Pond A during initial decommissioning. Photo 2: Pond A mixing operation. This procedure <br /> Excavators mixing residual liquids in pond with dirt was necessary to remove all residuals from pond <br /> from southern berm. and expose primary liner. Soil was hauled to <br /> Altamont Landfill for disposal. <br /> An i <br /> ; s 4( ,i <br /> Photo 3: Geo-net drainage layer overlying eastern Photo 4: Geo-net drainage layer overlying side wall <br /> berm. of Pond A. Underlying clay appeared to be intact <br /> and dry. <br />