Laserfiche WebLink
Mike Infurna EH <br /> From: Kelly Hagman [KellyH@olives.com] <br /> Sent: Wednesday, June 06, 2007 8:23 AM <br /> To: Mike Infurna [EHI <br /> Subject: <br /> Musco Well Schematics <br /> Attachments: Document.pdf <br /> LJ <br /> Document.pdf(122 <br /> KB) <br /> Hi Mike, <br /> Attached are the well schematics for MW-13R, MW-24 (aka Location E) , and <br /> MW-25 (aka Location C) . <br /> FB-1 is the abandoned boring in the MW-14 and MW-23 vicinte The boring was drilled with <br /> Mud Rotary. Total Depth of boring was 125 ' bgs. We grouted it using tremie pipe extended <br /> to the bottom of the boring. <br /> one SOlb bag of Aquagel Bentonite were installed <br /> Thirty 941b bags of Portland Cement and <br /> to seal the boring. <br /> co dary line <br /> FB-2 is the abandoned boring along the MusWhenrtheraugersty nwere pulledn the boring <br /> the ast <br /> corne. Total boring depth was 225 bgs. <br /> collapsed 10 ' given a total depth of 215' bgs. <br /> Sixty five 941b bags of Portland Cement and one 50 lb bag of Aquagel Bentonite were <br /> installed to seal the boring. <br /> Any questions or comments, feel free to email or call me. <br /> Kelly Hegman <br /> Musco Family olive Co. <br /> 17950 Via Nicolo <br /> Tracy, California 95376 <br /> (209) 640-2964 (cell) <br /> (209) 836-4678 ext 371 <br /> (209) 836-0853 (fax) <br /> kellyh@olives.com <br /> 1 1 <br />