Laserfiche WebLink
0 Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Les Chau [LesChau@Ken nedyJenks.com] <br /> Sent: Wednesday, May 30, 2007 5:46 PM <br /> To: Todd Del Frate; Meredith Durant <br /> Cc: BenH@muscoolive.com; Mike McLeod; KellyH@olives.com; Mike Infurna [EH] <br /> Subject: Summary for this morning conference call <br /> The following items were discussed in this order and decisions made. <br /> 1. The exploratory boring "intended hedge well" bottomed at a depth of 225' bgs has no detectable water. <br /> The decision was made to pressure grout the hole in lieu of completing a well at this location. This will be <br /> �1 competed today. <br /> 2. Thursday-Musco and KJ will further discuss possible locations for the actual Wells A/B of designated <br /> background monitoring. Currently, we do not believe that the location marked offsite -across the fence -is <br /> adequate because of the high possibility that there will be no detectable shallow GW. We note that it is the <br /> shallow GW that is foremost in establishing GW quality for the site as in background ambient <br /> concentrations. <br /> We may have to separate the pairing of these two wells with the shallow (Well A)relocated further up hill <br /> about a 1,000'due west and south of MW-61R. The deep (B)well may be proposed further east or <br /> northeast to help encounter deep GW. These locations will be discussed with Todd Del Frate prior to <br /> Friday's meeting. <br /> 3. Today (Wed) - Boring Well C was advanced to 95'bgs (405' MSL)last evening, no GW was encountered. <br /> The nearby well MW-1 has GW levels steady at 399' MSL. Decision was made this morning to advance <br /> the boring to another 50 feet bgs to attempt to encounter what was anticipated to be shallow groundwater. <br /> �4/ If GW is encountered at reasonable depths (shallow or deep), a well will be constructed. This drilling is <br /> expected to be complete by Th Mday. <br /> 4. Thursday - Upon completion or termination of exploratory well C, the drill crew will mobilize to Well E. It is <br /> again expected to encounter shallow groundwater. This will end the week of drilling <br /> 5. Friday - RWQCB Meeting. A location for an upgradient well —200 feet due south from MW61R will be <br /> proposed (see Letter to Board dated . It is not determined whether this location is more viable for shallow <br /> GW background monitoring (see Item 2). It does however stand a better chance of encountering shallow <br /> GW because of its location being further up hill than the currently marked location for Well A. <br /> 6. Friday-an additional deep GW monitoring well will be proposed near MW-15 to further investigate very <br /> deep GW, its origin, and extent. <br /> Please send comments and correction anytime. <br /> Les Chau <br /> Principal Hydrogeologist <br /> Kennedy/Jenks Consultants <br /> 415-243-2496 (SF Office); 650-852-2800 (Palo Alto); 415-370-8050 (cell phone) <br /> 5/31/2007 <br />