My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Ben Hall • 2 • 9 November 2010 <br /> Musco Family Olive Company <br /> water table. Staff recommends Musco minimize the screen installed above the <br /> saturated zone to accommodate the declining groundwater elevations. However, the <br /> well is not required to fully penetrate the saturated zone if it exceeds 20 feet. <br /> 6. The Discharger shall submit a summary of the unsaturated zone lysimter work <br /> conducted and any additional recommendations to repair the system. This summary <br /> must be included in the groundwater monitoring well installation report. <br /> Staff appreciates the effort Musco has put forth to comply with the request to upgrade the <br /> DMP associated with the Class II surface impoundments, The Discharger shall incorporate <br /> the recommendations listed above into the scope of work. Musco shall submit a groundwater <br /> monitoring well installation report by 15 January 2011, and shall include an evaluation of the <br /> unsaturated zone monitoring system. <br /> Musco has proposed to collect monthly samples of the newly installed groundwater wells to <br /> compile a dataset for statistical analysis, which will be presented in a Water Quality Protection <br /> Standards (WQPS) Report. This plan is acceptable and the WQPS Report is due by <br /> 15 May 2012. <br /> Please call me at-916-464-4737 if you have any questions <br /> Z;�':F-4-et�' � <br /> TODD A. DEL FRATE, P.G. <br /> Engineering Geologist <br /> Compliance and Enforcement Unit <br /> Cc: Donna Heran, San Joaquin County Environmental Health Department, Stockton0 <br /> Dennis Leikam, Musco Family Olive Company, Tracy <br /> Michael Campos, Stoel Rives, Sacramento <br /> Gary Carlton, Kennedy/Jenks, Rancho Cordova <br /> Meredith Durant, Kennedy/Jenks, San Francisco <br /> Paul Harpainter, Tracy <br /> i <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.