My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUIREMENTS PRIOR TO USE AND HOW TO OPERATE <br /> Attaching the Access Tubes Once the depth and location for the Pressure-Vacuum Soil Water <br /> Sampler have been established,you must determine the required <br /> length for the access tubes before they are cut and attached to the <br /> Soil Water Sampler. <br /> The access tubes are generally made of 1/4-inch O.D. polyethyl- <br /> ene, nylon,or teflon tubing. Each access tube is inserted into the <br /> loosened top portion of the tube connector located on the service- <br /> able end of the Soil Water Sampler.Tighten the fittings to finger <br /> tightness.We recommend using 2 different colors of tubing to dif- <br /> ferentiate between the two connectors in order to eliminate mis- <br /> takes in identifying the access tubes once the Sampler is placed in <br /> the soil. Soilmoisture offers both black and green polyethylene <br /> tubing,models 1903L and 1904L respectively. <br /> Pressure Testing Before We highly recommend pressure testing the complete Sampler as- <br /> Installation sembly prior to installation. Your prior testing will confirm the <br /> integrity of all joints and components. <br /> After allowing the ceramic portion of the Sampler to soak in water <br /> for approximately two hours,a sustained pressure of 20 psi can be <br /> applied to the submerged Sampler,associated tubing,and connec- <br /> tors. Continuous bubble formation indicates leakage and shows <br /> the exact location of any leak. <br /> Coring the Hole The Pressure-Vacuum Soil Water Sampler,Model 1920F1,may be <br /> installed at any depth up to a maximum of 50 feet. <br /> fit-,,.•_ , '� <br /> r t.; ... <br /> I , <br /> Figure 4a. Figure 4h <br /> In rock-free,uniform soils at shallow depths, use a 2-inch screw or <br /> bucket auger for coring the hole(Figure 4a).If the soil is rocky,a 4- <br /> inch auger should be used. The soil is then sifted (Figure 4b) <br /> through a 1/4-inch mesh screen to free it of pebbles and rocks./This <br /> SOIIMOISTURE EOUIPMENT CORP. 9 \® <br /> P.O.Box 30025, Santo Barbaro,Colifomio 93105 USA / \ <br /> Phone:(805)964-3525•Fox:(805)683-2189 s�� <br /> e-mail:soles®soilmolsture.com• Web:http://www.soilmoistufe.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.