My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will provide a reasonably uniform backfill soil for filling in around <br /> the Soil Water Sampler. Soilmoisture has suitable soil augers for <br /> this purpose (230 Series augers).There are other methods for in- <br /> stalling the Soil Water Sampler to be used,largely dictated by the <br /> type of soil you are dealing with and the tools available.The pri- <br /> mary concern in any method of installation is that the porous ce- <br /> ramic cup of the Sampler be in tight,intimate contact with the soil <br /> so that soil water can move readily from the pores of the soil through <br /> the pores in the ceramic cup and into the Soil Water Sampler. <br /> Preparing The Hole Using a After the hole has been cored,mix sifted soil with water to make a <br /> Slurry and Backfilling The slurry which has a consistency of cement mortar. This slurry is <br /> Hole then poured down to the bottom of the cored hole to insure a good <br /> soil contact with the porous ceramic cup(see Figure 5a). <br /> DepthDepth <br /> as Required as Required <br /> Slurry slurry <br /> Figure 5a. Figure 5b. <br /> Immediately after the slurry has been poured,insert the Soil Wa- <br /> ter Sampler down into the hole so that the porous ceramic cup is <br /> completely embedded in the soil slurry (see Figure 5b). <br /> SOILMOISTURE EQUIPMENT CORP. 10 \® <br /> P.O. Box 30025, Santo Barbara, California 93105 USA / \ <br /> Phone:(805)964-3525• Fox:(805)683.2189 E <br /> e-mail:solesesoilmoisture.com•Web:http://www.soilmoistufe.com \� <br />
The URL can be used to link to this page
Your browser does not support the video tag.