- - - - - <br /> ' h4 K L E I N F E L D E R <br /> 3 FIELD ACTIVITIES <br /> Based upon the available information and discussions with Mr. Tim O'Brian of the RWQCB, <br /> Kleinfelder proposes to advance a total of six (6) soil borings at the Musco Olive Products <br /> facility. Two "deep" borings will be advanced; one at the one million gallon storage pond, and <br /> one boring at the proposed 72 million gallon storage pond. Four (4) "shallow" borings will be <br /> advanced in the disposal field. <br /> 3.1 PRE-FIELD ACTIVITIES <br /> The San Joaquin County Public Health Services Department/Environmental Health Division <br /> (PHS/EHD) requires completion of a boring permit and payment fees prior to advancing <br /> exploratory borings. Because this workplan will be reviewed and approved by the RWQCB prior <br /> to commencing field activities, we do not anticipate that submittal of the workplan to PHS/EHD <br /> will be necessary. Kleinfelder will prepare drilling permit applications for submittal to <br /> PHS/EHD along with the required fees and the RWQCB workplan approval. The permits must <br /> be approved prior to drilling and sampling activities. PHS/EHD usually requires up to <br /> approximately two weeks to issue the permits. <br /> The drilling subcontractor will contact Underground Service Alert 48 hours prior to conducting <br /> fieldwork to notify local utilities of our proposed subsurface work. Kleinfelder will additionally <br /> prepare a health and safety plan prior to proceeding with field activities. <br /> 3.2 EXPLORATORY BORINGS <br /> 3.2.1 Shallow Borings <br /> Four shallow soil borings will be advanced in the land application area to an approximate depth <br /> of thirty (30) feet below the ground surface. Two borings will be advanced in the disposal field <br /> north of the Western Pacific Railroad and two borings will be advanced south of the Western <br /> Pacific Railroad. Boring locations will be dependent upon access and surface conditions. <br /> The four shallow soil borings will be advanced with a track mounted drill rig equipped with <br /> straight flight auger. During advancement of the soil borings, soil samples will be collected at <br /> 20-2594-03.W P2/2011 R002 Page 4 of 12 <br /> Copyright 2000 Kleinfelder,Inc. December 29,2000 <br />