My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�— -- KLEINFELDER <br /> 4 LABORATORY ANALYSIS <br /> 4.1 SOIL ANALYSIS <br /> A minimum of two (2) soil samples from both deep borings in the pond areas will be analyzed. <br /> The samples analyzed will be collected from plastic (fat) clays as they are encountered and <br /> interpreted to be aquitard material. The soil samples will tested for the following parameters: <br /> Hydraulic conductivity utilizing a flexible wall permeameter using ASTM 5084-90. <br /> Grain size distribution using ASTM D-422. <br /> The soil samples will be tested in the"undisturbed" condition and not remolded. <br /> 4.2 GROUNDWATER ANALYSIS <br /> A maximum of two groundwater samples will be submitted to a State certified laboratory and <br /> analyzed for the following: <br /> • Sodium by EPA Method 200.7 <br /> • Chloride by Met 4500 CLI-D <br /> • Total Dissolved Solids by EPA Method 160.1 <br /> • Dissolved Inorganic Solids by EPA Method 160.4 <br /> • Specific Conductivity by EPA Method 120.1 <br /> The samples will be analyzed on a normal laboratory schedule requiring approximately two <br /> weeks (ten working days) for completion. <br /> 20-2594-03.WP2/2011R002 Pagel of 12 <br /> Copyright 2000 Kleinfelder,Inc. December 29,2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.