My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> One additional shallow monitoring well labeled"Canal Influence"is proposed to be located just <br /> northeast of the proposed Well Cluster 2 on the Safeway property. This groundwater monitoring <br /> well will target the same depth interval as the shallow well in Cluster 2 (i.e., the shallow <br /> groundwater zone)for tho purpose of evaluating the potential impact of leakage from the <br /> California Aqueduct.A total of five groundwater monitoring wells are proposed for Study Area 1. <br /> Access agreements for it stallation and monitoring of wells on the Safeway property have not <br /> yet been secured by Musco(Musco 2008). <br /> Musco believes that the proposed Well Clusters 1 and 2 and the Canal Influence well farther <br /> northeast will provide the data necessary to understand the nature and interaction of <br /> groundwater in the alluvial fan system that underlies the Site with groundwater of regional origin. <br /> More importantly, it is anticipated that these new and the existing monitoring wells will in time <br /> provide the data to support the following: <br /> • Hypothesis of a mixing zone in Area 1 between shallow groundwater and deeper <br /> groundwater;and <br /> • Analysis of sulfate concentrations in onsite Wells MW-12 and MW-7. <br /> 8:2.2 Study Area 2 <br /> Proposed Soil Boring 4, located approximately 600 feet north of the former 1-MG pond as <br /> shown on Figure 19, will loe drilled to the depth of first encountered groundwater. This boring will <br /> provide lithologic data approximately half-way between existing Wells MW-4 and MW-8 to <br /> supplement the previous findings. This boring will not be completed as a monitoring well, but will <br /> be advanced to better characterize the spatial distribution of clays and sands In Study Area 2, <br /> as well as to confirm that shallow groundwater is absent in this location. If shallow groundwater <br /> is present in this location, the boring will be completed as a groundwater monitoring well.The <br /> stratigraphic data collected in this boring will be used to assess the potential for groundwater to <br /> flow from the natural drainage Swale to the north or northwest of the Site. No access agreement <br /> is heeded. <br /> Proposed Well Cluster 3 is to be located just northeast of the 84-MG reservoir, approximately <br /> halfway between existing Welts MWA6 and MW-4(Figure 19). The purpose of this well is to <br /> assess the depth to grour dwater and groundwater quality in this offsite location,as well as <br /> supplement stratigraphic,data collected in Soil Boring 4.Access agreements for installation and <br /> monitoring at this location have not yet been secured by Musco(Musco 2008). A total of one <br /> soil:-boring and one groundwater monitoring well are proposed for Study Area 2. <br /> 8.1 3 Study Area 3 <br /> As shown on Figure 19, proposed Well Cluster 5 is to be located near the northernmost reach of <br /> the property, approximately 900 feet northwest of existing Well MW-7. The boring will be <br /> advanced to first encountered groundwater, which is expected to be in the deep zone. The <br /> purpose of this groundwater monitoring well is to assess deep groundwater quality and <br /> elevation at the furthest downgradient on-site location.A total of one well is proposed for Study <br /> Area 3. No access agreement is needed. <br /> Paye,26 Phase f Groundwater Investigation and Work Plan for Phase II Investigation <br /> Musco Family Olive Company, Tracy, California <br /> a4+9av�,+nYwMrDAlamy i.moh.no,.pomlmov d,�ran..�whenmlM�.cmwswtpnartaac <br />
The URL can be used to link to this page
Your browser does not support the video tag.