Laserfiche WebLink
Kennedy/Jenks Consultants <br /> 8.2.4 Supplemental Investigation: Upgradient Offsite Deep Well <br /> Installations <br /> Three (3)deep monitoring wells similar to Wells MW-2 and MW-25 are proposed in an ongoing <br /> and supplemental investigation effort to characterize offsite and upgradient water quality <br /> (Section 6.7)and gradient(Figure 4).These data points are considered equal in priority with <br /> those discussed above to collect the information necessary to develop WQPS for the Site.The <br /> locations of the three deep wells identified as PDW-1, -2, and-3 are shown on Figure 20. <br /> Because of the complex terrain surrounding locations PDW-1 and -2,alternative locations are <br /> selected as contingency and they are identified as ADW-1 and ADW-2. <br /> These deep wells are proposed to provide additional water quality and gradient data to further <br /> understand the influences of upgradient groundwater on shallow groundwater quality beneath <br /> the Site and potential mixing of the shallow and deep groundwater. Deep Well PDW-3 is located <br /> near Well MW-3, and Well PDW-2 is adjacent to Well MW-13 with the intent of fingerprinting <br /> water quality signatures in localized areas. Depending on the success of encountering <br /> groundwater at depths of greater than 150 feet(similar to Wells MW-2 and MW-25), Musco may . <br /> propose to the RWQCB additional investigations with inter-well pumping tests and temperature <br /> tracer tests to confirm hydraulic communication within the tightly braided and variable-depth <br /> (i.e. heterogeneous)groundwater zones beneath the Site.The installation and sampling <br /> procedures for these monitoring wells will be similar to those proposed for wells in Study Areas <br /> 1 to 3. <br /> 8.3 Field Activities <br /> The following field activities will be conducted: drilling and installing monitoring wells,developing <br /> the wells, and collecting groundwater samples from monitoring wells for laboratory analysis. <br /> 8.3.1 Pre-Field Activities <br /> The following pre-field activities will be conducted prior to initiating fieldwork at the Site: <br /> • Update the site-specific Health and Safety Plan. <br /> • Complete access negotiations for installation and sampling of offsite monitoring wells. <br /> • Obtain well installation permits from the San Joaquin County EHD. <br /> • Select and mark the specific locations for the new monitoring wells. <br /> • Survey the proposed boring locations for potential location conflicts with subsurface <br /> utilities by performing a utility clearance check prior to drilling.The survey will be <br /> performed by contacting Underground Service Alert(USA)for utility clearance at least <br /> two working days before the scheduled fieldwork commences. In addition, a private <br /> subsurface utility locating service will perform a search for underground utilities at the <br /> proposed drilling locations. <br /> • Contract with a California licensed(C-57)drilling contractor to perform fieldwork. <br /> Phase I Groundwater Investigation Report and Work Plan for Phase I/Investigation Page 27 <br /> Musco Family Olive Company, Tracy, California <br /> B'�+9d+P�+�WbN,101Df.�mmmNr.WBmVa41d11r196,t1tpAmiY�'FW R�3y�.Ah,•LLwt GInWLLA¢ <br />