Kennedy/Jenks Consultants <br /> • Tabulated summaries of the groundwater monitoring data. <br /> • Laboratory analytical data reports and chain-of-custody forms. <br /> I <br /> The Report will be signed and stamped by a California Professional Engineer or Geologist. It is <br /> anticipated that the Report will be submitted to the RWQCB by 15 July 2008. <br /> 8.7.2 Quarterly Reporting <br /> In accordance with the MRP, quarterly groundwater monitoring reports will be prepared <br /> summarizing the results of each quarterly monitoring event.The quarterly report will Include <br /> updated groundwater data tables and figures, and will be submitted by Musco in accordance <br /> with the WDRs. <br /> 8.8 Anticipated Schedule <br /> The monitoring wells will be installed and developed following receipt of approval from the <br /> RWQCB on this Work Plan and successful negotiation of access agreements for offsite <br /> groundwater monitoring wells (if necessary).Assuming that RWQCB approval of the Work Plan <br /> is received by the end of March 2008,and access agreements(if necessary)are obtained by <br /> the end of April 2008, and also assuming a normal or low precipitation volume, Musco <br /> anticipates that the new monitoring wells will be installed by the end of May 2008. A status <br /> report on the access agreement process was submitted to the RWQCB on 15 January 2008 <br /> (Musco 2008). <br /> Following their iniiial sampling,the new wells will be sampled on a monthly basis through the <br /> end of 2008. Musco proposes that final characterization of background groundwater quality and <br /> the development of WQPS will be based on data from at least eight monitoring events for new <br /> and existing wells. Following completion of these eight groundwater monitoring events,the <br /> monitoring frequency for the newly-installed wells will be reduced to quarterly, consistent with <br /> that of Musco's other monitoring wells as set forth in the WDRs. <br /> As required by Task 23 of the CDO, the WQPS Report will be submitted to the RWQCB as part <br /> of the Report of Waste Discharge in March 2009. <br /> I <br /> Phase 1 Groundwater Investigation Report and Work Plan torPhase 11 Investigation Page 31 <br /> Musco Family Olive Company, Tracy, California <br /> Vu+ WMnVDW=Ma.00.�r m&4M.e�1*p irm TWhm 1mw cbu. <br />