Laserfiche WebLink
nnedy/Jenks Consultants <br /> Musco intends to construct a concrete slab of sufficient area to contain the new tank, pumps, <br /> the solids separation equipment currently located at the 1-MG pond, and a small control room <br /> for meters and sensors. Following installation and testing of the new tank and pumping systems, <br /> the new tank system will be placed in operation, and use of the existing 1-MG pond will be <br /> discontinued. Water will be removed from the 1-MG pond by pumping and transferred back to <br /> the onsite wastewater management system. <br /> Following drainage of the 1-MG pond and after allowing the pond surface to dry, Musco will <br /> collect and analyze soil samples to evaluate the impact of past practices on the soils underlying <br /> the pond. This Work Plan describes the proposed methods for collection and analysis of soil <br /> samples to assess the nature and extent of that impact. <br /> fi <br /> Work Plan for Soil Characterization, Page 3 <br /> Musco Family Olive Company, Tracy, California <br />