My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ennedy/Jenks Consultants <br /> Section 3: Site Description <br /> The olive processing Facility and packaging plant are located in the northern portion of the Site, <br /> adjacent to Highway 580. The 1-MG pond is located to the southwest of the processing Facility <br /> along the western property boundary, northeast of the 84-MG reservoir and between <br /> groundwater monitoring wells MW-4 and MW-5. The Groundwater Characterization Report <br /> (Kennedy/Jenks 2004a) characterized the topography of the processing area as somewhat flat, <br /> transitioning to rolling and sometimes steep hills south of the plant near the 1-MG pond and land <br /> application area. <br /> The USGS digital raster graphic (DRG) of the surface topography at the Site shows the 1-MG <br /> pond was constructed at an elevation of approximately 330 feet above mean sea level (AMSL) <br /> with a topographic gradient of approximately 0.1 vertical feet per horizontal foot(ft/ft), which is <br /> equivalent to a 4.5% slope. Over the years, the banks of the 1-MG pond have become steeply <br /> incised due to scouring. The 1-MG pond is accessible by unpaved roads. <br /> i.. <br /> Work Plan for Soil Characterization, Page 4 <br /> Musco Family Olive Company, Tracy, California <br /> _._ p3;-�.roupSaOcenyobW7s79fOh Wird„pdivg�p9.re�waSsu�chei�lmOnonQ,wrkpinllezt rbc <br />
The URL can be used to link to this page
Your browser does not support the video tag.