Laserfiche WebLink
ennedy/Jenks Consultants <br /> Section 6: Schedule <br /> Musco intends to discontinue olive processing activities for the summer on 29 June 2007. The <br /> 1-MG pond will remain in service through early July to facilitate process shutdown activities <br /> within the Facility. Musco anticipates that water will be pumped out of the 1-MG pond by <br /> mid-July. <br /> Following receipt of approval on this work plan from the RWQCB and adequate drying of the <br /> pond floor to allow sampling personnel access for hand augering, the soil samples will be <br /> collected from beneath the pond floor. <br /> The technical report providing the results of the soil sampling activities is intended to be <br /> submitted to the RWQCB by 15 November 2007, however, the schedule for performing the soil <br /> characterization activities is contingent upon installation of the replacement aboveground tank <br /> and adequate drying of the drained 1-MG pond. <br /> Work Plan for Soil Characterization, Page 10 <br /> Musco Family Olive Company, Tracy, California <br /> ., 9''uc9iaup4MminyoWG219201G400_mu,cmlve!UYiexr�soBci!aracinrGpun!Is•0.pin!taxtdoc <br />