Laserfiche WebLink
Development Services <br /> Memorandum <br /> UP-92-20 <br /> Page 3 <br /> M. Any construction materials and necessary equipment for <br /> the transfer and/or storage of construction materials <br /> shall be contained in a specified area that is fenced <br /> to provide an effective visual barrier. <br /> n. An Improvement Plan, prepared by a registered Civil <br /> Engineer, showing drainage, driveway access details, <br /> on-site parking, existing and proposed utility <br /> services, and grading, shall be submitted for approval. <br /> Storm drainage/additional run-off shall be retained on- <br /> site, provisions shall be shown on the Improvement <br /> Plan. (Planning Title Section 9-10002) <br /> CM/ <br />