Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for DAMERON HOSPITAL as of June 02, 2020. <br /> Open violations from October 25, 2018 inspection <br /> Violation#302-Failed to review Plan once every five years and/or implement any resulting <br /> amendments. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan was last reviewed on March 31, 2011 A <br /> review and evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this <br /> review and evaluation, the SPCC Plan must be amended within 6 months of review,and recertified by a <br /> Professional Engineer if any technical amendments were made. Immediately conduct a review of the facility <br /> SPCC Plan and make any necessary amendments. <br /> ❑ This violation was corrected ®This violation will be corrected by(date) 6/12/2020 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> SPCC Plan is being re-evaluated and shall be amended. SPCC Plan will be re-certified by a <br /> professional engineer. <br /> Violation#601-Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan does not follow the order or requirements in <br /> 40 CFR Part 112, and a cross-reference was not provided. if you do not follow the sequence specified in 40 <br /> CFR 112 for the Plan, you must prepare an equivalent Plan and supplement it with a section <br /> cross-referencing the location of requirements in 40 CFR 112 and the equivalent Plan. Immediately amend <br /> the SPCC Plan to include a cross-reference or to follow the required sequence. <br /> ❑ This violation was corrected ® This violation will be corrected by(date) 6/12/2020 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> SPCC Plan will be re-written to follow the order of 40 CFR Part 112 and will include a <br /> cross-reference sheet. <br /> Violation#603-Failed to adequately describe the physical layout of the facility in the Plan. <br /> The Underground Storage Tank(UST)is not marked as"exempt"on the facility diagram. The Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan shall include a facility diagram which must mark the <br /> location and contents of each fixed storage container and the storage area where mobile or portable <br /> containers are located. It must identify the location of and mark as"exempt"underground tanks. It must also <br /> include all transfer stations and connecting pipes, including intra-facility gathering lines. Immediately <br /> update the facility diagram to include all of the required information. Submit a legible copy of the updated <br /> facility diagram to the EHD for review. <br /> Page 1 of 4 <br />