Laserfiche WebLink
Environmental Protection Agency §112.7 <br /> (ii)As described in paragraph(b)(3) of (2) Comply with all applicable re- <br /> this section, the facility owner or oper- quirements listed in this part. Except <br /> ator may not self-certify measures as as provided in §112.6, your Plan may <br /> described in §112.9(c)(6) for produced deviate from the requirements in para- <br /> water containers and any associated graphs (g), (h)(2) and (3), and (i) of this <br /> piping. Such measures must be re- section and the requirements in sub- <br /> viewed and certified,in writing, by a li- parts B and C of this part, except the <br /> censed Professional Engineer, in ac- secondary containment requirements <br /> cordance with§112.3(d)(1)(vi). in paragraphs (c) and (h)(1) of this sec- <br /> (iii) The review and certification by tion, and §§112.8(c)(2), 112.8(c)(11), <br /> the Professional Engineer under this 112.9(c)(2), 112.9(d)(3), 112.10(c), <br /> paragraph is limited to the alternative 112.12(c)(2), and 112.12(c)(11), where ap- <br /> method which achieves equivalent en- plicable to a specific facility, if you <br /> vironmental protection pursuant to provide equivalent environmental pro- <br /> §112.7(a)(2); to the impracticability de- tection by some other means of spill <br /> termination and measures in lieu of prevention, control, or counter- <br /> secondary containment pursuant to measure. Where your Plan does not <br /> §112.7(d); or the measures pursuant to conform to the applicable requirements <br /> §112.9(c)(6) for produced water con- in paragraphs (g), (h)(2) and (3), and (i) <br /> tainers and any associated piping and of this section, or the requirements of <br /> appurtenances downstream from the subparts B and C of this part, except <br /> container. the secondary containment require- <br /> [73 FR 74302, Dec. 5, 2008, as amended at 74 ments in paragraph (c) and (h)(1) of <br /> FR 58810,Nov.13,20091 this section, and §§112.8(c)(2), <br /> 112.8(c)(11), 112.9(c)(2), 112.10(c), <br /> §112.7 General requirements for Spill 112.12(c)(2), and 112.12(c)(11), you must <br /> Prevention, Control, and Counter- state the reasons for nonconformance <br /> measure Plans. in your Plan and describe in detail al- <br /> If you are the owner or operator of a ternate methods and how you will <br /> facility subject to this part you must achieve equivalent environmental pro- <br /> prepare a Plan in accordance with good tection. If the Regional Administrator <br /> engineering practices. The Plan must determines that the measures Be- <br /> have the full approval of management scribed in your Plan do not provide <br /> at a level of authority to commit the equivalent environmental protection, <br /> necessary resources to fully implement he may require that you amend your <br /> the Plan. You must prepare the Plan in Plan, following the procedures in <br /> writing. If you do not follow the se- §112.4(d)and(e). <br /> quence specified in this section for the (3)Describe in your Plan the physical <br /> Plan, you must prepare an equivalent layout of the facility and include a fa- <br /> Plan acceptable to the Regional Ad- cility diagram, which must mark the <br /> ministrator that meets all of the appli- location and contents of each fixed oil <br /> cable requirements listed in this part, storage container and the storage area <br /> and you must supplement it with a sec- where mobile or portable containers <br /> tion cross-referencing the location of are located. The facility diagram must <br /> requirements listed in this part and the identify the location of and mark as <br /> equivalent requirements in the other "exempt" underground tanks that are <br /> prevention plan. If the Plan calls for otherwise exempted from the require- <br /> additional facilities or procedures, ments of this part under §112.1(d)(4). <br /> methods, or equipment not yet fully The facility diagram must also include <br /> operational, you must discuss these all transfer stations and connecting <br /> items in separate paragraphs, and must pipes, including intra-facility gath- <br /> explain separately the details of instal- ering lines that are otherwise exempt- <br /> lation and operational start-up. As de- ed from the requirements of this part <br /> tailed elsewhere in this section, you under §112.1(d)(11). You must also ad- <br /> must also: dress in your Plan: <br /> (a)(1) Include a discussion of your fa- (i) The type of oil in each fixed con- <br /> cility's conformance with the require- tainer and its storage capacity. For <br /> ments listed in this part. mobile or portable containers, either <br /> 39 <br />