Laserfiche WebLink
§112.7 40 CFR Ch. 1 (7-1-19 Edition) <br /> provide the type of oil and storage ca- propriate supporting material as ap- <br /> pacity for each container or provide an pendices. <br /> estimate of the potential number of (b) Where experience indicates a rea- <br /> mobile or portable containers, the sonable potential for equipment failure <br /> types of oil, and anticipated storage ca- (such as loading or unloading equip- <br /> pacities; ment, tank overflow, rupture, or leak- <br /> (ii) Discharge prevention measures age, or any other equipment known to <br /> including procedures for routine han- be a source of a discharge), include in <br /> dling of products (loading, unloading, your Plan a prediction of the direction, <br /> and facility transfers, etc.); rate of flow, and total quantity of oil <br /> (iii) Discharge or drainage controls which could be discharged from the fa- <br /> such as secondary containment around cility as a result of each type of major <br /> containers and other structures, equip- equipment failure. <br /> ment, and procedures for the control of (c) Provide appropriate containment <br /> a discharge; and/or diversionary structures or <br /> (iv) Countermeasures for discharge equipment to prevent a discharge as <br /> discovery, response, and cleanup (both described in §112.1(b), except as pro- <br /> the facility's capability and those that vided in paragraph (k) of this section <br /> might be required of a contractor); for qualified oil-filled operational <br /> (v) Methods of disposal of recovered equipment, and except as provided in <br /> materials in accordance with applica- §112.9(d)(3)for flowlines and intra-facil- <br /> ble legal requirements; and ity gathering lines at an oil production <br /> (vi) Contact list and phone numbers facility. The entire containment sys- <br /> for the facility response coordinator, tem, including walls and floor, must be <br /> National Response Center, cleanup con- capable of containing oil and must be <br /> tractors with whom you have an agree- constructed so that any discharge from <br /> ment for response, and all appropriate a primary containment system, such as <br /> Federal, State, and local agencies who a tank, will not escape the contain- <br /> must be contacted in case of a dis- ment system before cleanup occurs. In <br /> 1case ). determining the method, design, and <br /> chargee described in§ <br /> capacity for secondary containment, <br /> (4) Unless you have submitted a re- <br /> sponse plan under §112.20, provide in- you need only to address the typical <br /> failure mode, and the most likely quan- <br /> formation and procedures in your Plan tity of oil that would be discharged. <br /> to enable a person reporting a dis- Secondary containment may be either <br /> charge as described in §112.1(b) to re- active or passive in design. At a min- <br /> late information on the exact address imum, you must use one of the fol- <br /> or location and phone number of the fa- lowing prevention systems or its equiv- <br /> cility; the date and time of the dis- alent: <br /> charge, the type of material dis- (1)For onshore facilities: <br /> charged; estimates of the total quan- (i) Dikes, berms, or retaining walls <br /> tity discharged; estimates of the quan- sufficiently impervious to contain oil; <br /> tity discharged as described in (ii) Curbing or drip pans; <br /> §112.1(b); the source of the discharge; a (iii) Sumps and collection systems; <br /> description of all affected media; the <br /> cause of the discharge; any damages or (iv) Culverting, gutters, or other <br /> drainage systems; <br /> injuries caused by the discharge; ac- <br /> tions being used to stop, remove, and (v)Weirs, booms, or other barriers; <br /> mitigate the effects of the discharge; (vi) Spill diversion ponds; <br /> whether an evacuation may be needed; (vii)Retention ponds; or <br /> and, the names of individuals and/or or- (viii) Sorbent materials. <br /> ganizations who have also been con- (2)For offshore facilities: <br /> tacted. (i)Curbing or drip pans; or <br /> (5) Unless you have submitted a re- (ii) Sumps and collection systems. <br /> sponse plan under §112.20, organize por- (d) Provided your Plan is certified by <br /> tions of the Plan describing procedures a licensed Professional Engineer under <br /> you will use when a discharge occurs in §112.3(d), or, in the case of a qualified <br /> a way that will make them readily usa- facility that meets the criteria in <br /> ble in an emergency, and include ap- §112.3(g), the relevant sections of your <br /> 40 <br />