§112.7 40 CFR Ch. 1 (7-1-19 Edition)
<br /> provide the type of oil and storage ca- propriate supporting material as ap-
<br /> pacity for each container or provide an pendices.
<br /> estimate of the potential number of (b) Where experience indicates a rea-
<br /> mobile or portable containers, the sonable potential for equipment failure
<br /> types of oil, and anticipated storage ca- (such as loading or unloading equip-
<br /> pacities; ment, tank overflow, rupture, or leak-
<br /> (ii) Discharge prevention measures age, or any other equipment known to
<br /> including procedures for routine han- be a source of a discharge), include in
<br /> dling of products (loading, unloading, your Plan a prediction of the direction,
<br /> and facility transfers, etc.); rate of flow, and total quantity of oil
<br /> (iii) Discharge or drainage controls which could be discharged from the fa-
<br /> such as secondary containment around cility as a result of each type of major
<br /> containers and other structures, equip- equipment failure.
<br /> ment, and procedures for the control of (c) Provide appropriate containment
<br /> a discharge; and/or diversionary structures or
<br /> (iv) Countermeasures for discharge equipment to prevent a discharge as
<br /> discovery, response, and cleanup (both described in §112.1(b), except as pro-
<br /> the facility's capability and those that vided in paragraph (k) of this section
<br /> might be required of a contractor); for qualified oil-filled operational
<br /> (v) Methods of disposal of recovered equipment, and except as provided in
<br /> materials in accordance with applica- §112.9(d)(3)for flowlines and intra-facil-
<br /> ble legal requirements; and ity gathering lines at an oil production
<br /> (vi) Contact list and phone numbers facility. The entire containment sys-
<br /> for the facility response coordinator, tem, including walls and floor, must be
<br /> National Response Center, cleanup con- capable of containing oil and must be
<br /> tractors with whom you have an agree- constructed so that any discharge from
<br /> ment for response, and all appropriate a primary containment system, such as
<br /> Federal, State, and local agencies who a tank, will not escape the contain-
<br /> must be contacted in case of a dis- ment system before cleanup occurs. In
<br /> 1case ). determining the method, design, and
<br /> chargee described in§
<br /> capacity for secondary containment,
<br /> (4) Unless you have submitted a re-
<br /> sponse plan under §112.20, provide in- you need only to address the typical
<br /> failure mode, and the most likely quan-
<br /> formation and procedures in your Plan tity of oil that would be discharged.
<br /> to enable a person reporting a dis- Secondary containment may be either
<br /> charge as described in §112.1(b) to re- active or passive in design. At a min-
<br /> late information on the exact address imum, you must use one of the fol-
<br /> or location and phone number of the fa- lowing prevention systems or its equiv-
<br /> cility; the date and time of the dis- alent:
<br /> charge, the type of material dis- (1)For onshore facilities:
<br /> charged; estimates of the total quan- (i) Dikes, berms, or retaining walls
<br /> tity discharged; estimates of the quan- sufficiently impervious to contain oil;
<br /> tity discharged as described in (ii) Curbing or drip pans;
<br /> §112.1(b); the source of the discharge; a (iii) Sumps and collection systems;
<br /> description of all affected media; the
<br /> cause of the discharge; any damages or (iv) Culverting, gutters, or other
<br /> drainage systems;
<br /> injuries caused by the discharge; ac-
<br /> tions being used to stop, remove, and (v)Weirs, booms, or other barriers;
<br /> mitigate the effects of the discharge; (vi) Spill diversion ponds;
<br /> whether an evacuation may be needed; (vii)Retention ponds; or
<br /> and, the names of individuals and/or or- (viii) Sorbent materials.
<br /> ganizations who have also been con- (2)For offshore facilities:
<br /> tacted. (i)Curbing or drip pans; or
<br /> (5) Unless you have submitted a re- (ii) Sumps and collection systems.
<br /> sponse plan under §112.20, organize por- (d) Provided your Plan is certified by
<br /> tions of the Plan describing procedures a licensed Professional Engineer under
<br /> you will use when a discharge occurs in §112.3(d), or, in the case of a qualified
<br /> a way that will make them readily usa- facility that meets the criteria in
<br /> ble in an emergency, and include ap- §112.3(g), the relevant sections of your
<br /> 40
<br />
|