My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2800 - Aboveground Petroleum Storage Program
>
PR0526379
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:59:24 PM
Creation date
6/2/2020 3:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0526379
PE
2832
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> Area B: <br /> The 275-gallon day use tank associated with the exempt 6,000-gallon UST, is located in the <br /> original boiler room within the main hospital. This room is secured and locked at all times. <br /> Area C: <br /> The 250-gallon AST is secured within a masonry wall enclosure with a metal sliding door and <br /> inside a secondary containment unit with additional security locks. <br /> 1.H Spill Prevention Control and Countermeasures Plan <br /> In accordance with§112.7(a)3 <br /> A physical layout of the facility and the depiction of information provided in this plan is provided in <br /> Attachment A. It includes a Vicinity Map, Site Map, and Figures A3 —A-5 where each area is depicted. <br /> 1.1 Conformance <br /> In accordance with§112.7(a)1 and§112.76) <br /> The state of California, HSC§25270.4.5, states that an owner or operator of a storage tank facility shall <br /> prepare a Spill Prevention Control and Countermeasure Plan (SPCC Plan) prepared in accordance Title <br /> 40 of the Code of Regulations, Part 112. <br /> This SPCC plan was written to conform with 40 CFR part 112 requirements. The facility therefore <br /> conforms with general requirements for oil storing facilities in California. <br /> PART 2. SPILL RESPONSE AND REPORTING <br /> 2.A Spill History <br /> In accordance with§112.7 <br /> In 2006, an overflow occurred at the grease trap tank located in Area B, see Appendix A, Figure A-4. <br /> The tank lid was open and heavy rain caused the tank to overflow. Measures to prevent any material <br /> from entering the storm drain system were instituted immediately. Absorbent material was used to <br /> solidify the spill and the material was then vacuumed and disposed of off-site. Lastly, the sidewalk and <br /> gutters were steam cleaned and the run-off was collected and disposed of off-site. <br /> There have been no other spills within the operating history of Dameron Hospital. <br /> 2.113 Spill Response Materials <br /> In accordance with§112.7(a)5 <br /> Each described area has a designated location where the spill response equipment is located. The <br /> location is labeled in Appendix A, Figures A-3 through A-5. The response equipment inventory for each <br /> facility includes: <br /> • Clean absorbent material <br /> • Absorbent waddles to contain any spilled material <br /> • Quick dry materials <br /> • Various brooms and shovels <br /> • Clean and empty 55-gallon drums for the liquid waste. <br /> Dameron Hospital <br /> Spill Prevention Control and Countermeasure Plan <br /> June 29,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.