Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Health and Safety <br /> Table 7.1 - continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.12-6 Asbestos, if present in existing 4.12-6 Structures that would he removed or renovated as part of Screening and remedi- SJCBD PC and C <br /> faun structures, could cause the project should he screened or surveyed for the presence ation should be <br /> adverse health impacts to workers of asbestos-containing materials. If asbestos were present, completed by a quali- <br /> during renovation and/or renovation and/or demolition should be undertaken only by fied professional. <br /> demolition. licensed asbestos abatement contractors trained in proper Verification of com- <br /> asb stos removal and disposal procedures. pletion should be <br /> provided by applicant. <br /> 4.12-7 Materials disposed of at the small 4.12-7 'Me applicant should demonstrate that the disposed Soil and groundwater SJCEIID PC <br /> household landfill on the site may materials do not constitute a health or environmental sampling by qualified <br /> have affected soil and groundwater hazard. Such demonstration could be achieved through professional. Demon- <br /> quality. removal of disposed material in conjunction with soil stration of adequate <br /> sampling and groundwater sampling. removal, if necessary, <br /> provided by applicant. <br /> 4.12-8 The project could result in 4.12-8 No mitigation measure would be required if applicable None necessary. <br /> increased use, storage, and statutes and regulations were followed by businesses <br /> disposal of hazardous materials. associated with the project. <br /> 4.12-9 Failure or overtopping of the 4.12-9 The applicant should prepare an Emergency Response Review at SP stage. SJC Office SP <br /> levees along Old River and Plan for the project which includes procedures for of <br /> canals at the northern boundary response to flooding events. The plan should present Emergency <br /> of the project site could result an emergency communication system, Identify Services <br /> in flooding, posing risks to emergency coordinators, and establish evacuation <br /> human health and safety and procedures. The Emergency Response Plan should be <br /> property. reviewed and approved by the San Joaquin County <br /> Office of Emergency Services prior to approval of the <br /> Specific Plan. <br /> 4.12-10 Open water bodies within the 4.12-10 The applicant should prepare and submit a mosquito Review at SP stage. SJC SP <br /> project site could provide active abatement program as part of the Specific Plan. The Mosquito <br /> breeding sites for mosquitos, program should identify expected and potential areas Abatement <br /> potentially causing an conducive to active breeding of mosquitoes. The District and <br /> environmental nuisance program should present specific mosquito abatement SJCCDD <br /> conditlon and disease techniques which would minimize potential degradation <br /> transmission. of water quality. The program should be submitted to <br /> the San Joaquin County Mosquito Abatement District <br /> for review and approval. The applicant should be <br /> responsible for implementation of the program. <br />