Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitorinle <br /> 4.12-11 The development of the project 4.12-11(a) Businesses and public Institutions located adjacent to Review at occupancy SJCEHD As needed. <br /> may Increase the potential for the established buffer zone should maintain emergency of relevant <br /> public exposure to explosives, contingency and evacuation plans for the event of a businesses. <br /> fire, or the release of materials catastrophic accident. <br /> during railway accidents on the <br /> railway line crossing the <br /> northern portion of the project <br /> site. <br /> 1 <br /> 'SJCCDD: San Joaquin Countv Community Development Department; sJCBD:San Joaquin Counly Building Division;SJCDPW San Joaquin County Department of Puhlic Works;USAC'E: U.S.Army Corps <br /> of Engineers; SJCFC F: San Joaquin County Flood Control Engineer: CSI):Community Services District (of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEHD:San Joaquin County Environmental Health Department:DMS:California Department of Health Services;I.AFCO:Local Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage: SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map approval or and Final Map approvals and other discretionary application <br /> approvals)- - ''onstruction stage (prior to building permit issuance): O: Operational stage. <br />