Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.14-7 The project would generate a 4.14-7(a) Further detailed analysis of parking demand, parking supply, Review at SP stage. SJCCDD SP <br /> significant demand for parking. and shared parking opportunities should be undertaken <br /> during the Specific Plan process when detailed site plans <br /> become available. Parking provisions should comply <br /> with requirements of the County's prevailing <br /> Congestion Management Program. <br /> 4.14-7(b) Where feasible, mixed-use districts should be developed to Review at SP stage. SJCCDD SP <br /> maximize the use of shared parking and reduce the total <br /> land area need for parking. <br /> 4.14-8 The project would increase the 4.14-8(a) Bicycle use between the project and other nearby developed Review at SP stage. SJCCDD SP <br /> demand for bicycle travel within areas should he encouraged by the provision of Class If <br /> the project site as well as between bicycle lanes on major arterials and County roads connecting <br /> the site and adjacent developed the site to Tracy and Alameda County. The sponsor's <br /> areas. proposed bicycle facilities and accommodations should be <br /> incorporated into Specific Plan design standards. <br /> 4.14-8(h) A continuous Class 11 bicycle lane should be extended by the Review at SP stage. SJCCDD SP <br /> project sponsor into the City of Tracy. Grant Line Road <br /> should be considered for continuous bicycle lanes between <br /> the project site and the City of Tracy. <br /> . t <br /> 4.14-8(c) The sponsor should provide fair share funding for a A Review at SP stage. SJCCDD SP <br /> continuous bicycle route should be by th@ spp <br /> along Altamont Pass Road or a comparable route to connect <br /> the project site and Alameda County. <br /> 4.14-9 The project would increase the 4.14-9(a) Improvements provided by the project sponsor at the two at- Review at SP stage. SJCCDD SP and PC <br /> number of vehicles crossing the grade crossings within the site on Kelso Road and <br /> existing Southern Pacific railroad Ilenderson Road should include crossing gates, lights, and <br /> track that runs through the site. appropriate signage. Pedestrian access to the railroad <br /> right-of-way should be restricted to ensure safe <br /> conditions. Pedestrian crossings over the railroad <br /> tracks should be considered at the Specific Plan stage. <br /> 'SJCCDD:San Joaquin County Community Development Department; SJC'BD:San Joaquin County Building Division;SJCDPW San.loaquin County Department of Public Works;USACti: U.S.Artily Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer. CSD:Community Services District(of project), RWQCB: Regional Water Quality Control Board;CDFG: California Department of fish <br /> and Game:SJCEI ID:San Joaquin County Fnvironntental I Icalth Department:DI IS:California Department of Health Services:IAFCO:local Agency Formation Commission. "Inose responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> ' GPA: General Plan Amendment stage: SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map appi:Qual oF and Final Map approvals and other discretionary applicatlon <br /> approvals) Construction stage (prior to building permit issuance): O: Operational stage. <br />