Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Transportation <br /> Table 7.1 -continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.14-6 Project-generated trips would 4.14-6(a) Tlie internal road adjacent to the Freeway Commercial Review at SP stage. SJCCDD: SP <br /> result in significant traffic levels on parcel in the project's southeast corner should be upgraded SJCDPW <br /> roadways internal to the site, to major arterial status with six travel lanes by 2010. 'Ibis <br /> requiring construction of a road would constitute the primary access to that portion of <br /> comprehensive network of the project site south of Grant Line Road. Six lanes on this <br /> adequately sized internal roadways. segment would provide sufficient capacity to provide LOS D <br /> Internal roadway needs would be operation, closely approaching LOS C. This road should <br /> slightly greater with the Proposed either be shifted to the north to allow greater weaving <br /> Project Scenario than with the distance on Patterson Pass Road south to 1-205, or <br /> Market-Constraint Scenario. should be combined with the collector road shown <br /> across from existing Von Sosten Road to form a single <br /> arterial roadway entrance to the southwest corner of <br /> the project. <br /> 4.14-6(b) Under the Proposed Project Scenario, the north-south minor Review at SP stage. SJCCDD; SP <br /> arterial proposed for the west side of the project site (Figure SJCDPW <br /> 4.14-5) should be upgraded to a six-lane major arterial <br /> between the proposed town center and that portion of the <br /> site north of Byron Road by 2005. <br /> 4.14-6(c) Options for direct access between Byron Road and the Review at SP stage. SJCCDD: SP <br /> northern portion of the site should be considered, such as SJCDPW <br /> flyover ramps to and from Byron Road or interchanges <br /> where Byron Road passes under the proposed major arterial <br /> extension of Patterson Pass Road. Any such direct access <br /> alternative should include a grade-separated railroad <br /> crossing. "finis mitigation measure would reduce delay for <br /> travel between the site and the City of"Tracy by providing a <br /> less circuitous connection between Byron Road and the <br /> portion of the site north of Byron Road. <br /> 4.14-6(d) The Specific Plan should provide for development of an Review at SP stage. SJCCDD: SP <br /> additional minor arterial in the west-central area of the site S.ICDPW <br /> that would allow internal arterials in this portion of the site <br /> to remain four lanes at buildout or, alternatively, expand the <br /> currently proposed minor arterial to six lanes in this <br /> se nient. <br /> 4.14-6(e) 'Ilic collector roadway couplet connection between Patterson Rcview at SP stage. SJCCDD: SP <br /> Pass Road and the town center should be eliminated. SJCDPW <br />