Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitorine <br /> • water or cover stockpiles of debris, soil, sand, or other <br /> materials that can be blown by the wind; <br /> • sweep construction areas and adjacent streets of all mud <br /> and debris, since this material can be pulverized and later <br /> resuspended by vehicle traffic; <br /> • limit the speed of all construction vehicles to 15 miles per <br /> hour on unpaved roads while on site; <br /> • cover or wet down all materials transported by truck; <br /> • water all inactive portions of the site with an appropriate <br /> dust suppressant or cover or seed inactive areas. <br /> Completed areas of the site and long-term stockpiles of <br /> soil should be seeded within 30 days of completion of <br /> activity. <br /> 'S.ICCDD:San Joaquin County Community Development Department; SJC'BD:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACC: U.S.Arnty Corps <br /> of Engineers: SJCFCB: San Joaquin County Flood Control Engineer; CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEHD:San Joaquin Counly Environmental Health Department;DHS:California Department of Health Services;fAFCO:1,ocal Agency Formation Commission. 'Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage; SP: Specific Plan stage: PC: Pre-construction stage: (includes 'Tentative Map apprcwal or and Final Map approvals and other discretionary application <br /> approvals' Construction stage (prior to building permit issuance); O: Operational stage. <br />