Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.16-1(e) Noise studies for specific residential projects proposed in Review of acoustical SJCCDD SP and PC <br /> noise impacted areas (exposed to an Ld. above 60 dB) should studies. <br /> address how noise levels in outdoor use areas, such as <br /> backyards, patios, decks, etc., could be maintained below an <br /> L, of 60 d13. Other noise-sensitive land uses, such as <br /> schools, hospitals, and parks should also require similar <br /> studies. <br /> 4.16-1(0 Interior noise levels for housing proposed to be located in Review of acoustical SJCCDD SP and C <br /> areas exposed to an L, above 60 d13 should be maintained studies. <br /> below an La of 45 dB. Compliance with this recommended <br /> mitigation measure should be verified at the time of the <br /> Specific Plan. <br /> 4.16-1(g) Because of the potential for aircraft overflights, the Review of acoustical SJCCDD SP, PC, and <br /> results of a noise study should be Included In the studies O <br /> Specific Plan to determine whether changes In the land <br /> use plan and/or treatments to the noise sensitive <br /> structures would be required to minimize or eliminate <br /> noise impacts to project site occupants. Also, the <br /> County should consider requiring that potential new <br /> residents be notified of the presence of the airport and <br /> of the potential for aircraft overflights. <br /> SJCCDD: San Joaquin C'atutly Community Development Department: SJC13D:San Joaquin County Building Division;S.ICDPW San Joaquin County Department of Public Works;USACF: U.S.Army Corps <br /> of Engineers; SJCFCF: San Joaquin County l7lood Conlrol Engineer: CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEI ID:San Joaquin County Environmental Health Department;DI IS:California Department of Health Services;L1FCO:Kcal Aeency Forntatiott Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> 'GPA: General Plan Amendment stage: SP: Specific Plan stage: PC: Pre-construction stage: (Includes Tentative Map appswval u and Final Map approvals and other discretionary application <br /> approvals) Construction stage (prior to building permit issuance): O: Operational stage. <br />