My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
residential areas . The proposed pedestrian/bicycle <br /> trail along Mountain House Creek must be <br /> grade-separated where it crosses the tracks to ensure <br /> pedestrian safety. <br /> • See FEIR, Section 4 . 14 . <br /> W. AIR QUALITY <br /> W-1 . Potentially Significant Impact • Air Ouality/Odor <br /> Conflicts <br /> [ Impact 4 . 15-21 <br /> The Project would increase the potential for air quality <br /> and odor-related land-use conflicts . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into , the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • See Attachment C-1, Section I-1 . <br /> • See FEIR, Section 4 . 15 . <br /> W-2 . Potentially Significant Impact • Construction-Generated <br /> Dust/Particulate Matter <br /> [ Impact 4 . 15-31 <br /> Construction activities would generate dust and <br /> particulate matter which could exceed the PM-10 threshold <br /> of significance by 0 . 96 ton per day. <br /> Finding: Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. The Air <br /> Pollution Control District would share responsibility for <br /> these measures . <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • The severity of construction impacts can be reduced <br /> to a level that is less-than-significant through <br /> application of appropriate mitigation measures . To <br /> C2-72 <br /> 0189r/0202r <br />
The URL can be used to link to this page
Your browser does not support the video tag.